Massachusetts permit data report

Massachusetts Building Permits, August 2026: 13,829 Filed

Published October 2, 2026. Permits filed through September 30, 2026; data pulled October 2, 2026.

13,829 construction permits were filed in August 2026 across the 45 Massachusetts municipalities whose permit portals we track continuously, 1.0% more than in August 2025 (13,690).

Compared with July 2026, filings fell 2.4%. Boston filed the most (2,981, 21.6% of the total), followed by Worcester and Cambridge. 29 of the 45 municipalities filed more permits than a year earlier and 13 filed fewer.

Permits filed, August 2026
13,829
Change vs August 2025
+1.0%
13,690 a year earlier
Change vs July 2026
−2.4%
14,175 in July 2026
Bar chart of construction permits filed per month in 45 Massachusetts municipalities, 2025 and 2026; August is highlighted. Jan 2025 12,022, 2026 10,778; Feb 2025 10,778, 2026 10,080; Mar 2025 13,370, 2026 13,555; Apr 2025 14,164, 2026 14,541; May 2025 13,639, 2026 13,350; Jun 2025 13,201, 2026 14,156; Jul 2025 13,924, 2026 14,175; Aug 2025 13,690, 2026 13,829; Sep 2025 14,605, 2026 14,014; Oct 2025 15,808; Nov 2025 12,318; Dec 2025 12,033.
Massachusetts construction permits filed per month, August 2026 highlighted. Chart: permits.llc. SVG · CSV

Massachusetts building permits by town, August 2026

The ten municipalities with the most construction permits filed, of the 45 we track continuously. The CSV has all 45.

Top ten Massachusetts municipalities by construction permits filed, August 2026
#TownPermitsShareAugust 2025Change
1Boston2,98121.6%3,345−10.9%
2Worcester1,0367.5%1,068−3.0%
3Cambridge7155.2%797−10.3%
4Falmouth6915.0%633+9.2%
5Somerville5203.8%507+2.6%
6Attleboro4113.0%400+2.8%
7Billerica3962.9%403−1.7%
8Taunton3422.5%309+10.7%
9Braintree3342.4%261+28.0%
10Mashpee3252.4%401−19.0%

Planning a project in one of these towns? Local contractors are listed on masshomecomfort.com for Boston, Worcester, Cambridge, Falmouth, Somerville, Attleboro, Billerica, Taunton, Braintree and Mashpee.

Building permits by type, August 2026

Permit types as each municipality records them. Building permits cover structural work, additions, roofing, siding, windows and similar projects; the trade permits (electrical, plumbing, gas, mechanical) are filed separately for the same jobs.

Massachusetts construction permits by permit type, August 2026
TypePermitsShareAugust 2025Change
Building5,39339.0%5,472−1.4%
Electrical4,17330.2%4,238−1.5%
Plumbing1,96014.2%1,845+6.2%
Gas1,47910.7%1,251+18.2%
Mechanical and sheet metal4823.5%486−0.8%
Trench and street opening1290.9%173−25.4%
Sign920.7%110−16.4%
Fire alarm and sprinkler760.5%51+49.0%
Demolition450.3%64−29.7%

Massachusetts building permits by month, 2025 vs 2026

Construction permits filed per month in 45 Massachusetts municipalities, 2025 and 2026
Month20252026Change
January12,02210,778−10.3%
February10,77810,080−6.5%
March13,37013,555+1.4%
April14,16414,541+2.7%
May13,63913,350−2.1%
June13,20114,156+7.2%
July13,92414,175+1.8%
August13,69013,829+1.0%
September14,60514,014−4.0%
October15,808
November12,318
December12,033

The six months together: Massachusetts building permits, first half of 2026.

How we counted

Which municipalities. The 45 Massachusetts cities and towns whose own permit portals we have read continuously since January 2025, each with at least one construction permit in every month from January 2025 through September 2026. Every page in this series uses the same 45, so months and years compare like with like. They are not a random sample of the state: Boston alone is 22% of the total, so read the figures as these municipalities, not as a statewide count.

Which records. Construction permits only: building, electrical, plumbing, gas, mechanical and sheet metal, fire protection, trench, sign and demolition permits. Licences, food and health permits, inspections, certificates of occupancy, zoning applications and similar records that some portals publish alongside permits are excluded (27,138 such records across the whole file).

Which date. The filing (application) date, not the issue date or the date we collected the record. Permits filed late in the period can still reach the portals, so the most recent month may rise slightly when we refresh.

Duplicates. Records flagged as duplicates are excluded. A 2026 re-import of Cambridge loaded each permit twice under two number formats; the second copy (7,289 records) is removed.

Left out on purpose.Municipalities we read through a third-party records portal (Viewpoint) are not in this series. We checked that feed against Plymouth's own monthly reports and found it held a fraction of the town's permits, and a smaller fraction in 2025 than in 2026, which would show growth that did not happen. Boston and Cambridge, checked against their open-data portals for March 2025 and March 2026, matched within a few percent in both years.

Data. Town, month and permit count for all 45 municipalities: massachusetts-building-permits-august-2026.csv. No owner, applicant, contractor or address fields. Free to reuse under CC BY 4.0 with a link to this page.