Do I need a permit in Boston, and who pulls it?

In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.

The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.

Need a licensed contractor? See HVAC, roofing and other contractors serving Boston on Mass Home Comfort.

Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.

Heating and cooling in BostonReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more

The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Boston building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.

Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.

If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.

Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.

Full Massachusetts guide
Windows and doors in BostonReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more

Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Boston building department makes, so ask before assuming.

In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.

If Boston has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide
Roofing in BostonRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Boston treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more

The state's guidance is that the registered contractor applies for the permit, not you.

The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Boston building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.

Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.

Full Massachusetts guide
Siding in BostonResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Boston plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Boston building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more

On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.

If Boston has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide

Recent building permits in Boston

65,043 permits on file across 22 months. Records through October 15, 2026, updated daily.

Last 90 days: 3,227 building, 1,347 electrical, 914 plumbing, 587 gas, 69 demolition.

Permits commonly pulled in Boston over the last twelve months: 12,243 building, 5,295 electrical, 3,840 plumbing, 2,664 gas and 285 demolition permits.

Most recent building permits filed in Boston, Massachusetts
FiledStreetType
Oct 15, 2026E India ROElectrical
Oct 15, 2026Dorchester STBuilding
Oct 15, 2026Linvale TEBuilding
Oct 15, 2026Cummins HWBuilding
Oct 15, 2026Fairfield STBuilding
Oct 15, 2026Charlemont STBuilding
Oct 15, 2026Donnybrook RDBuilding
Oct 15, 2026Lexington STBuilding
Oct 15, 2026Chestnut STElectrical
Oct 14, 2026Litchfield STElectrical
Oct 14, 2026Snow Hill STBuilding
Oct 14, 2026Holbrook STElectrical
Oct 14, 2026Prince STGas
Oct 14, 2026Whitcomb AVGas
Oct 14, 2026Prince STPlumbing
Oct 14, 2026Greaton RDPlumbing
Oct 14, 2026Greaton RDGas
Oct 14, 2026Massachusetts AVElectrical
Oct 14, 2026Clarendon STElectrical
Oct 14, 2026Bradwood STElectrical
Oct 14, 2026Bond STPlumbing
Oct 14, 2026Reed STPlumbing
Oct 14, 2026Saxton STElectrical
Oct 14, 2026Beckler AVPlumbing
Oct 14, 2026E Concord STElectrical
Oct 14, 2026West Roxbury PWPlumbing
Oct 14, 2026Linvale TEElectrical
Oct 14, 2026Undine RDElectrical
Oct 14, 2026Washburn STDemolition
Oct 14, 2026Mount Vernon STBuilding
Oct 14, 2026Browning AVBuilding
Oct 14, 2026Mount Everett STBuilding
Oct 14, 2026Kirkwood RDBuilding
Oct 14, 2026Faraday STGas
Oct 14, 2026E First STBuilding
Oct 14, 2026Faraday STElectrical
Oct 14, 2026E Seventh STBuilding
Oct 14, 2026Grayson STElectrical
Oct 14, 2026Wooddale AVDemolition
Oct 14, 2026E Fourth STBuilding
Oct 14, 2026E Fourth STBuilding
Oct 14, 2026PARKER STBuilding
Oct 14, 2026Temple STElectrical
Oct 14, 2026Sutherland RDElectrical
Oct 14, 2026Mount Vernon STBuilding
Oct 14, 2026Glenville AVPlumbing
Oct 14, 2026Wellesley PKBuilding
Oct 14, 2026Alicia RDBuilding
Oct 14, 2026Huntington AVBuilding
Oct 14, 2026Wiltshire RDBuilding

Get quotes from local contractors for a project in Boston.

Permits by type in Boston

Monthly archive

Construction permits by month in Boston

Construction permits filed in Boston each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.

Construction permits filed per month in Boston, 2025 and 2026
YearJanFebMarAprMayJunJulAugSepOctNovDec
20252,9042,3162,8592,7372,8982,8033,4193,3453,1263,7872,7132,691
20262,5182,5173,0873,1122,9692,7673,2632,9812,711

Before you plan work in Boston

Boston's Inspectional Services Department, on the fifth floor of 1010 Massachusetts Avenue, is made up of five regulatory divisions — building, housing, health, environmental sanitation and weights and measures, with a constituent services division for the call centre, community liaisons and the investigation and enforcement team — and its mission is to enforce the building, housing, health and environmental regulations consistently across the city's residential and business communities. Its Commissioner's Bulletins are the official guidance on how Boston's codes, policies and regulations are applied. Building permits are applied for through the city's online permitting portal, where an approved permit can be printed, and the department's pages cover scheduling an inspection, the Zoning Board of Appeal, checking the status of a building or fire permit, searching historical permit records, the Fast Track permit program, certifying fire escapes, balconies and exterior bridges, inclusionary zoning, construction site safety requirements, permitting in the flood hazard district and changing the licensed builder on a permit. Service requests go through 311, records through the city's public records centre. The office is open weekdays 8 to 4. Marc Joseph is Deputy Commissioner and Inspector of Buildings.

Sources: City of Boston — Inspectional Services.

Towns near Boston

Frequently asked questions

Do I need a permit to replace my furnace, boiler or AC in Boston?

Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Boston may require a mechanical permit for the equipment. The licensed contractor pulls these permits.

Read the full Massachusetts guide
Do I need a permit to install a heat pump or mini split in Massachusetts?

Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.

Read the full Massachusetts guide
Do I need a permit to replace windows in Massachusetts?

Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.

Read the full Massachusetts guide
Do I need a permit to replace siding in Massachusetts?

Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.

Read the full Massachusetts guide
Do I need a permit to replace my roof in Boston?

Yes. Re-roofing is not exempt under the Massachusetts building code, so Boston will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.

Read the full Massachusetts guide
How long is a building permit good for in Massachusetts?

Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.

Read the full Massachusetts guide
Are building permits public record, and how do I look one up for an address in Boston?

Yes, permits are public records. Ask the building department in Boston how to search by address, or check the town's online portal if it has one. The recent filings table on this page shows the same public data with the street, date and permit type.

Read the full Massachusetts guide
Can a homeowner pull their own permit?

Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.

Read the full Massachusetts guide
What happens if work is done without a permit?

The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.

Explore Massachusetts

Are you a contractor?

Homeowners in Boston ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.

Get listed on masshomecomfort.com

Permit data for your business

Every Boston permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.

See permit alert plans