permits.llc

Middlesex County, Massachusetts

Everett, MA Building Department and Permits

Inspectional Services Department (ISD)

Hours
Mon & Thu 8:00-7:30; Tue-Wed 8:00-5:00; Fri closed
Inspector of Buildings
David Palumbo, Building Commissioner/Director of Inspectional Services

Verified 2026-09-16 against the official Everett website.

Do I need a permit in Everett, and who pulls it?

In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.

The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.

Need a licensed contractor? See HVAC, roofing and other contractors serving Everett on Mass Home Comfort.

Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.

Heating and cooling in EverettReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more

The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Everett building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.

Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.

If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.

Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.

Full Massachusetts guide
Windows and doors in EverettReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more

Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Everett building department makes, so ask before assuming.

In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.

If Everett has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide
Roofing in EverettRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Everett treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more

The state's guidance is that the registered contractor applies for the permit, not you.

The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Everett building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.

Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.

Full Massachusetts guide
Siding in EverettResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Everett plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Everett building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more

On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.

If Everett has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide

Recent building permits in Everett

946 permits on file across 19 months. Records through July 29, 2026.

Last 90 days: 16 building.

Permits commonly pulled in Everett over the last twelve months: 481 building, 50 mechanical, 4 electrical, 3 plumbing and 2 gas permits.

Most recent building permits filed in Everett, Massachusetts
FiledStreetType
Jul 29, 2026REVERE BEACH PWBuilding
Jul 29, 2026FERRY STBuilding
Jul 29, 2026HARVARD STBuilding
Jul 28, 2026ROVER STBuilding
Jul 27, 2026HEATH STBuilding
Jul 22, 2026BROADWAYBuilding
Jul 22, 2026BROADWAYBuilding
Jul 22, 2026MILL RDBuilding
Jul 22, 2026COURTLAND STBuilding
Jul 21, 2026CHATHAM RDBuilding
Jul 21, 2026FERRY STBuilding
Jul 20, 2026REVERE BEACH PWBuilding
Jul 20, 2026REVERE BEACH PWBuilding
Jul 20, 2026WINDSOR STBuilding
Jul 20, 2026UNION STBuilding
Jul 20, 2026ELM STBuilding
Jul 17, 2026RUSSELL STBuilding
Jul 16, 2026FULLER STBuilding
Jul 15, 2026CLIFTON AVBuilding
Jul 15, 2026NICHOLS STBuilding
Jul 15, 2026NICHOLS STBuilding
Jul 15, 2026RIVERGREEN DRBuilding
Jul 15, 2026WILBUR STBuilding
Jul 13, 2026ADAMS AVPlumbing
Jul 13, 2026CHELSEA STBuilding
Jul 13, 2026ADAMS AVGas
Jul 12, 2026WELLINGTON AVBuilding
Jul 9, 2026MALDEN STBuilding
Jul 9, 2026PEARL STBuilding
Jul 8, 2026GARLAND STBuilding
Jul 8, 2026WILBUR STBuilding
Jul 7, 2026CHELSEA STBuilding
Jul 7, 2026IRVING STBuilding
Jul 5, 2026LIBERTY STBuilding
Jul 5, 2026LIBERTY STBuilding
Jul 5, 2026LIBERTY STBuilding
Jul 2, 2026VERNAL STBuilding
Jul 2, 2026LEWIS STBuilding
Jul 2, 2026FOSTER STBuilding
Jun 30, 2026MILL RDBuilding
Jun 30, 2026MADISON AVBuilding
Jun 30, 2026MADISON AVBuilding
Jun 30, 2026FRANKLIN STBuilding
Jun 25, 2026GLENDALE STBuilding
Jun 25, 2026GLENDALE STBuilding
Jun 23, 2026ROBIN STBuilding
Jun 23, 2026TREMONT STBuilding
Jun 23, 2026REVERE BEACH PWMechanical
Jun 22, 2026MAIN STBuilding
Jun 20, 2026GLENDALE AVBuilding

Get quotes from local contractors for a project in Everett.

Permits by type in Everett

Monthly archive

Before you plan work in Everett

Everett's Inspectional Services Department, in Room 26 of City Hall at 484 Broadway, brings together the divisions of building inspection, code enforcement, health and sanitation, weights and measures, plumbing and gas and the wire division, along with the Board of Appeals and the Licensing Commission, under one director. The Division of Building Inspection enforces the state building code for buildings and structures and the related ordinances in the city's revised ordinances, including the zoning ordinance; the Board of Appeals hears appeals, special permits and variances under Chapter 40A, including petitions that follow a zoning denial letter from the building inspector. Permits are filed through the city's GeoTMS online permitting system. The building division's FAQ quotes the code's rule that no building may be constructed, altered, repaired, demolished or changed in use without first applying for and obtaining the permit, and its rule that a permit is abandoned if work has not started within six months of issuance, with extensions of up to six months each available on the owner's written request. The office is open Monday and Thursday 8 to 7:30 and Tuesday and Wednesday 8 to 5, closed Friday. David Palumbo is the Building Commissioner and Director of Inspectional Services, Michael Desmond the Assistant Building Inspector, and John DeVito and Robert Gatta the Local Building Inspectors.

Sources: City of Everett — Inspectional Services Department; City of Everett — Building.

Towns near Everett

Frequently asked questions

Do I need a permit to replace my furnace, boiler or AC in Everett?

Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Everett may require a mechanical permit for the equipment. The licensed contractor pulls these permits.

Read the full Massachusetts guide
Do I need a permit to install a heat pump or mini split in Massachusetts?

Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.

Read the full Massachusetts guide
Do I need a permit to replace windows in Massachusetts?

Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.

Read the full Massachusetts guide
Do I need a permit to replace siding in Massachusetts?

Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.

Read the full Massachusetts guide
Do I need a permit to replace my roof in Everett?

Yes. Re-roofing is not exempt under the Massachusetts building code, so Everett will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.

Read the full Massachusetts guide
How long is a building permit good for in Massachusetts?

Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.

Read the full Massachusetts guide
Are building permits public record, and how do I look one up for an address in Everett?

Yes, permits are public records. Everett uses GeoTMS, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.

Read the full Massachusetts guide
Can a homeowner pull their own permit?

Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.

Read the full Massachusetts guide
What happens if work is done without a permit?

The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.

Explore Massachusetts

Are you a contractor?

Homeowners in Everett ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.

Get listed on masshomecomfort.com

Permit data for your business

Every Everett permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.

See permit alert plans