permits.llc

Middlesex County, Massachusetts

Melrose, MA Building Department and Permits

Verified 2026-09-16 against the official Melrose website.

Do I need a permit in Melrose, and who pulls it?

In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.

The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.

Need a licensed contractor? See HVAC, roofing and other contractors serving Melrose on Mass Home Comfort.

Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.

Heating and cooling in MelroseReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more

The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Melrose building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.

Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.

If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.

Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.

Full Massachusetts guide
Windows and doors in MelroseReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more

Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Melrose building department makes, so ask before assuming.

In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.

If Melrose has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide
Roofing in MelroseRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Melrose treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more

The state's guidance is that the registered contractor applies for the permit, not you.

The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Melrose building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.

Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.

Full Massachusetts guide
Siding in MelroseResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Melrose plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Melrose building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more

On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.

If Melrose has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide

Recent building permits in Melrose

7,058 permits on file across 22 months. Records through October 16, 2026, updated daily.

Last 90 days: 637 building, 449 electrical, 266 plumbing, 146 gas, 62 sheet metal.

Permits commonly pulled in Melrose over the last twelve months: 1,862 building, 1,323 electrical, 799 plumbing, 396 gas and 197 sheet metal permits.

Most recent building permits filed in Melrose, Massachusetts
FiledStreetType
Oct 16, 2026MELROSE STBuilding
Oct 16, 2026ELLIS FARM LNBuilding
Oct 16, 2026HURD STBuilding
Oct 16, 2026FAXON STElectrical
Oct 16, 2026BOSTON ROCK RDPlumbing
Oct 16, 2026DEXTER RDPlumbing
Oct 16, 2026BRAZIL STBuilding
Oct 16, 2026BIRCH HILL RDBuilding
Oct 16, 2026FOSTER EAST STBuilding
Oct 16, 2026UPHAM STBuilding
Oct 16, 2026SARGENT STElectrical
Oct 15, 2026PORTER STBuilding
Oct 15, 2026PLYMOUTH CRBuilding
Oct 15, 2026FOSTER EAST STBuilding
Oct 15, 2026FRANKLIN STBuilding
Oct 15, 2026OAKLAND ST UNIT 1Building
Oct 15, 2026AARON ST UNIT 1Building
Oct 15, 2026ELLSWORTH AVElectrical
Oct 15, 2026RICHARDSON RDGas
Oct 15, 2026SANFORD STSheet Metal
Oct 15, 2026OAKLAND ST UNIT 1Building
Oct 15, 2026MAIN STElectrical
Oct 15, 2026SANFORD STSheet Metal
Oct 15, 2026BROOKLEDGE RDBuilding
Oct 15, 2026FRANKLIN STBuilding
Oct 15, 2026PLYMOUTH CRBuilding
Oct 15, 2026MALVERN STElectrical
Oct 15, 2026DEXTER RDPlumbing
Oct 15, 2026LINWOOD AVGas
Oct 14, 2026DAMON AVElectrical
Oct 14, 2026TRENTON STGas
Oct 14, 2026UNION STBuilding
Oct 14, 2026SCHOOL STBuilding
Oct 14, 2026FERDINAND STElectrical
Oct 14, 2026BOSTON ROCK RDElectrical
Oct 14, 2026ESSEX STGas
Oct 14, 2026UNION STBuilding
Oct 14, 2026UPHAM TRElectrical
Oct 14, 2026MAIN STElectrical
Oct 14, 2026FERDINAND STGas
Oct 14, 2026MAIN STGas
Oct 14, 2026ESSEX STPlumbing
Oct 14, 2026ESSEX STPlumbing
Oct 14, 2026TRENTON STElectrical
Oct 14, 2026LYNN FELLS PWBuilding
Oct 14, 2026SIMONDS RDElectrical
Oct 14, 2026PLEASANT ST UNIT 101Electrical
Oct 14, 2026FELTON PLElectrical
Oct 14, 2026FOSTER EAST STPlumbing
Oct 14, 2026MAIN STPlumbing

Get quotes from local contractors for a project in Melrose.

Monthly archive

Construction permits by month in Melrose

Construction permits filed in Melrose each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.

Construction permits filed per month in Melrose, 2025 and 2026
YearJanFebMarAprMayJunJulAugSepOctNovDec
2025226201268265234254266258337301244214
2026200178210263278320309259423

Before you plan work in Melrose

Melrose's Inspectional Services, on the ground floor of City Hall at 562 Main Street, administers the codes for new construction, alterations, accessibility, electrical, plumbing and gas, sprinklers and fire protection, use and occupancy and zoning, and issues permits for everything from additions, decks, roofing, siding, sheds and fences to pools, solar, wood and pellet stoves, signs, tents, chimneys, demolition and HVAC. All permits are applied for on the city's online portal — paper forms exist in the office but are accepted only in extreme circumstances — and the city's permitting guide lists what a complete application carries: the contractor's HIC and CSL, a plot plan where the scope calls for it, an architect's affidavit for a structure over 35,000 cubic feet, design plans, a stretch energy code report for additions and new structures, an accurate construction cost including all sub-trades, and any conservation or historical approval. Melrose is a stretch code community and has adopted the specialized code, reviewing every application against the 2021 IECC; applications submitted from 1 January 2025 must comply with the tenth edition of 780 CMR. Owners of one- and two-family homes may pull their own permit, with the guide's warning that an owner who then hires a contractor may not be protected by the Home Improvement Guaranty Fund. Zoning also requires permits for sheds, fences, driveways and retaining walls that the code itself does not regulate.

Inspections run Monday to Thursday only, with none on Friday, and each is booked by phone on the day it is wanted: building inspections with Stephen Doucet between 8:30 and 9:30 a.m., electrical with Tom Minniear between 8 and 9:30 a.m., and plumbing and gas with Kenny Rogers between noon and 2 p.m. — email is not used for scheduling. Rough plumbing and electrical inspections must both be passed before a building inspection is requested, and solar inspections need the rooftop photos sent as a single PDF beforehand. The office is open Monday to Thursday 8:30 to 4 and Friday 8:30 to 12:30, and the city posts a property building permit history lookup and an ADU submission checklist.

Sources: City of Melrose — Inspection Services; City of Melrose — Permitting guide and common questions; City of Melrose — How to schedule inspections.

Towns near Melrose

Frequently asked questions

Do I need a permit to replace my furnace, boiler or AC in Melrose?

Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Melrose may require a mechanical permit for the equipment. The licensed contractor pulls these permits.

Read the full Massachusetts guide
Do I need a permit to install a heat pump or mini split in Massachusetts?

Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.

Read the full Massachusetts guide
Do I need a permit to replace windows in Massachusetts?

Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.

Read the full Massachusetts guide
Do I need a permit to replace siding in Massachusetts?

Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.

Read the full Massachusetts guide
Do I need a permit to replace my roof in Melrose?

Yes. Re-roofing is not exempt under the Massachusetts building code, so Melrose will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.

Read the full Massachusetts guide
How long is a building permit good for in Massachusetts?

Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.

Read the full Massachusetts guide
Are building permits public record, and how do I look one up for an address in Melrose?

Yes, permits are public records. Melrose uses PeopleGIS Simplicity, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.

Read the full Massachusetts guide
Can a homeowner pull their own permit?

Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.

Read the full Massachusetts guide
What happens if work is done without a permit?

The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.

Explore Massachusetts

Are you a contractor?

Homeowners in Melrose ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.

Get listed on masshomecomfort.com

Permit data for your business

Every Melrose permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.

See permit alert plans