Barnstable County, Massachusetts
Mashpee, MA Building Department and Permits
- The Mashpee Building Department is at 16 Great Neck Road North, Mashpee, MA 02649.
- Mashpee Building Department phone: 508-539-1406.
- Building permits in Mashpee are filed through PermitEyes, the online permit portal.
- Mashpee is in Barnstable County, Massachusetts.
- Last verified 2026-09-16 against the Mashpee website.
Building Department
- Phone
- 508-539-1406
Verified 2026-09-16 against the official Mashpee website. Always confirm hours before visiting.
Do I need a permit in Mashpee, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Mashpee on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in MashpeeReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Mashpee building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in MashpeeReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Mashpee building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Mashpee has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in MashpeeRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Mashpee treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Mashpee building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in MashpeeResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Mashpee plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Mashpee building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Mashpee has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Mashpee
7,420 permits on file across 22 months. Records through October 17, 2026, updated daily.
Last 90 days: 469 building, 247 electrical, 238 gas, 140 plumbing, 15 sheet metal, 7 mechanical.
Permits commonly pulled in Mashpee over the last twelve months: 1,702 building, 957 electrical, 760 gas, 718 plumbing and 64 sheet metal permits.
| Filed | Street | Type |
|---|---|---|
| Oct 17, 2026 | fells pond rd | Electrical |
| Oct 16, 2026 | elizabeth cir | Electrical |
| Oct 16, 2026 | pimlico pond rd | Building |
| Oct 16, 2026 | main st | Building |
| Oct 16, 2026 | mayfair ct | Electrical |
| Oct 16, 2026 | punkhorn point rd | Building |
| Oct 16, 2026 | shellback way | Gas |
| Oct 16, 2026 | lowell rd | Plumbing |
| Oct 16, 2026 | market street | Building |
| Oct 16, 2026 | northwest lndg | Electrical |
| Oct 16, 2026 | fells pond cir | Electrical |
| Oct 16, 2026 | pimlico pond rd | Building |
| Oct 16, 2026 | cambridge dr | Building |
| Oct 16, 2026 | gullane rd | Electrical |
| Oct 16, 2026 | walton heath way | Gas |
| Oct 16, 2026 | uncle edwards rd | Plumbing |
| Oct 16, 2026 | mashie cir | Building |
| Oct 16, 2026 | atlantic ct | Electrical |
| Oct 16, 2026 | atlantic ct | Gas |
| Oct 16, 2026 | pimlico pond rd | Electrical |
| Oct 16, 2026 | palmer rd | Building |
| Oct 16, 2026 | maple st | Building |
| Oct 15, 2026 | mashpee neck rd | Building |
| Oct 15, 2026 | bonwood dr | Electrical |
| Oct 15, 2026 | alma rd | Building |
| Oct 15, 2026 | fells pond rd | Gas |
| Oct 15, 2026 | edgewater rd | Plumbing |
| Oct 15, 2026 | hane rd | Electrical |
| Oct 15, 2026 | vineyard reach | Electrical |
| Oct 15, 2026 | eagle dr | Gas |
| Oct 15, 2026 | captains row | Building |
| Oct 15, 2026 | bluff ave | Electrical |
| Oct 15, 2026 | fells pond rd | Plumbing |
| Oct 15, 2026 | yellow fin | Electrical |
| Oct 15, 2026 | center st | Building |
| Oct 15, 2026 | ninigret ave | Building |
| Oct 15, 2026 | nehoiden rd | Electrical |
| Oct 15, 2026 | longwood rd | Electrical |
| Oct 15, 2026 | willowbend dr | Electrical |
| Oct 15, 2026 | great field landing | Building |
| Oct 15, 2026 | fells pond rd | Plumbing |
| Oct 15, 2026 | fells pond rd | Gas |
| Oct 14, 2026 | falmouth rd | Electrical |
| Oct 14, 2026 | lowell rd | Building |
| Oct 14, 2026 | old great neck rd | Electrical |
| Oct 14, 2026 | brewster rd | Plumbing |
| Oct 14, 2026 | willow cir | Building |
| Oct 14, 2026 | joy street | Plumbing |
| Oct 14, 2026 | leisure green dr | Gas |
| Oct 14, 2026 | red brook rd | Gas |
Get quotes from local contractors for a project in Mashpee.
Monthly archive
- Oct 2026240
- Sep 2026404
- Aug 2026337
- Jul 2026335
- Jun 2026382
- May 2026515
- Apr 2026441
- Mar 2026396
- Feb 2026255
- Jan 2026291
- Dec 2025334
- Nov 2025316
- Oct 2025413
- Sep 2025397
- Aug 2025411
- Jul 2025446
- Jun 2025334
- May 2025277
- Apr 2025311
- Mar 2025336
- Feb 2025248
- Jan 20251
Construction permits by month in Mashpee
Construction permits filed in Mashpee each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 1 | 240 | 294 | 288 | 265 | 318 | 433 | 401 | 390 | 387 | 312 | 329 |
| 2026 | 278 | 224 | 341 | 385 | 346 | 337 | 314 | 325 | 393 |
Before you plan work in Mashpee
Mashpee's Building Department at 16 Great Neck Road North permits construction, checks it by inspection and confirms zoning compliance; the Building Commissioner is also the town's Zoning Official and staffs the Zoning Board of Appeals. Residential and commercial building permits and electrical, mechanical, gas and plumbing permits are applied for through PermitEyes, with a read-only public view of permits and a public computer at the department window for anyone without one; a building application should carry copies of licences, the workers' compensation affidavit, an insurance certificate, a detailed plan set, a certified site plan and a HERS report where applicable. Building inspections must be called in by 9:30 a.m. to be done that day; wiring inspections are called in by the electrician and plumbing and gas inspections by the plumber, each inspector keeping morning inspection-office hours from 7:30 to 9.
The department's FAQ lists what needs a permit in Mashpee — re-roofing, window replacement, decks, additions, interior alterations, sheds over 200 square feet (every shed needs a zoning compliance form), garages, above-ground and in-ground pools, stairways, fences over eight feet, new construction and retaining walls over four feet — and says a building permit must be started within six months of issue, with one six-month extension available on request before it expires. A certificate of occupancy needs every final inspection signed off, the septic as-built and certifications where a new system went in, a final elevation certificate in a flood zone and a HERS report where applicable. David Morris is the Building Commissioner, Victor Devine the Wiring Inspector and Kevin Connolly the Plumbing and Gas Inspector.
Sources: Town of Mashpee — Building; Town of Mashpee — Online Permitting; Town of Mashpee — Building FAQ.
Towns near Mashpee
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Mashpee?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Mashpee may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Mashpee?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Mashpee will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Mashpee?
Yes, permits are public records. Mashpee uses PermitEyes, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Mashpee ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Mashpee permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.