permits.llc

Rockingham County, New Hampshire

Exeter, NH Building Department and Permits

  • The Exeter Building Department is at 10 Front Street, Exeter, NH 03833.
  • Exeter Building Department phone: 603-773-6112.
  • Exeter Building Department hours: Monday: 8:00 a.m.-4:30 p.m.; Tuesday: 8:00 a.m.-7:00 p.m.; Wednesday: 8:00 a.m.-4:30 p.m.; Thursday: 8:00 a.m.-4:30 p.m.; Friday: 8:00 a.m.-12:30 p.m.
  • Permit information for Exeter is on the Exeter website.
  • Exeter is in Rockingham County, New Hampshire.
  • Last verified 2026-09-18 against the Exeter website.

Building Department

Hours
Monday: 8:00 a.m.-4:30 p.m.; Tuesday: 8:00 a.m.-7:00 p.m.; Wednesday: 8:00 a.m.-4:30 p.m.; Thursday: 8:00 a.m.-4:30 p.m.; Friday: 8:00 a.m.-12:30 p.m.

Verified 2026-09-18 against the official Exeter website.

Do I need a permit in Exeter, and who pulls it?

New Hampshire has one building code for the whole state. Under RSA 155-A the State Building Code, the 2024 International Residential Code for one- and two-family homes and the 2023 National Electrical Code, each with New Hampshire amendments, applies in every city and town, and a permit is required before work covered by the code begins. What differs from town to town is the office that issues it: the state leaves permits, inspections and fees to each municipality, which is why this page starts with the Exeter building department.

Who applies is more open than in some states. The code lets the owner or the owner's authorized agent apply for a building permit, and New Hampshire issues no statewide general contractor licence. The trades are another matter: electrical installations need a licensed electrician, and gas fitting and plumbing need a licence from the Mechanical Licensing Board, in each case with a permit and inspection. The statute is explicit that the contractor is responsible for meeting the code, so the usual arrangement is that the contractor doing the work pulls the permit under their own licence.

Sources: RSA 155-A, New Hampshire Building Code (gc.nh.gov); NH Division of Fire Safety: State Building Code; International Residential Code 2024, Chapter 1 (ICC); OPLC: the licensing boards; RSA 319-C, Electricians (gc.nh.gov); RSA 153:27–36, plumbers and fuel gas fitters (gc.nh.gov).

Heating and cooling in ExeterReplacing a furnace, boiler or water heater, or installing a heat pump, ductless mini split or central air conditioner, is permitted work in New Hampshire: the code requires a permit to install, alter or replace any mechanical, gas or electrical system it regulates, and only portable appliances and minor part replacements are exempt. Anything on the gas side, a gas furnace, boiler, water heater or the piping to it, is fuel gas fitting, licensed by the state's Mechanical Licensing Board, and the wiring to a heat pump, mini split or condenser is an electrical installation that needs a licensed electrician.Read more

Ask the Exeter building department which permits it issues for the equipment itself; the contractor pulling them is expected to know.

New Hampshire has no separate HVAC contractor licence: the state's Mechanical Licensing Board licenses fuel gas fitters and plumbers, and oil heating technicians only on a voluntary basis, so do not expect an HVAC licence number. What you should expect is a fuel gas fitter licence on the gas work and an electrician's licence on the wiring, each with its own permit on file. The state also bars any town from restricting your choice of heating system or fuel supplier, so the decision between oil, propane, natural gas and a heat pump is yours.

If you are counting on an NHSaves rebate for a heat pump or central air conditioner, the conditions are the utility program's: a residential electric customer of Eversource, Liberty, Unitil or the New Hampshire Electric Co-op, equipment that meets the efficiency minimums, an install within the program year, and for the enhanced heat pump rebate a pre-verification before the install. A permitted, inspected installation is how the town documents the work; it does not replace the rebate paperwork.

Sources: International Residential Code 2024, Chapter 1 (ICC); RSA 153:27–36, plumbers and fuel gas fitters (gc.nh.gov); OPLC: Mechanical Licensing Board; RSA 319-C, Electricians (gc.nh.gov); RSA 155-A, New Hampshire Building Code (gc.nh.gov); NHSaves: heat pump and central AC rebates.

Full New Hampshire guide
Windows and doors in ExeterReplacing windows or exterior doors is not on the code's list of work exempt from a permit, that list is finish work such as painting, tiling, cabinets and counter tops, small detached sheds, fences and low decks, so plan on a permit in Exeter. The code's own exception for ordinary repairs stops at anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and enlarging or shrinking an opening alters the structure.Read more

Whether a strict like-for-like swap in the same opening counts as an ordinary repair is the Exeter building department's call, so ask before assuming.

New Hampshire issues no statewide licence for window or door installers, so the permit is the record of the work: it is issued by the town under the state code, and the owner or the contractor as the owner's agent applies for it. If Exeter has a historic district, the state statute leaves historic district ordinances fully in force, so exterior window and door changes inside one usually need the historic district commission's approval before the building permit issues.

Sources: International Residential Code 2024, Chapter 1 (ICC); RSA 155-A, New Hampshire Building Code (gc.nh.gov); OPLC: the licensing boards.

Full New Hampshire guide
Roofing in ExeterRe-roofing and roof replacement are not among the projects the code exempts from a permit, so in Exeter treat a roof job as permitted work: the code requires a permit to alter or repair a building, and its ordinary-repairs exception is written for minor work, not for stripping and replacing the weather envelope. The town issues the permit under the state code, and the statute makes the contractor responsible for meeting it.Read more

The code has requirements for roof coverings, underlayment and ice barrier that the inspector checks against, and New Hampshire adopts them with its own amendments: the 2024 edition from 1 July 2026, with permits accepted under either the 2021 or the 2024 code until the end of 2026. Rather than quote them here, ask the Exeter building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.

Sources: International Residential Code 2024, Chapter 1 (ICC); RSA 155-A, New Hampshire Building Code (gc.nh.gov); NH Division of Fire Safety: State Building Code.

Full New Hampshire guide
Siding in ExeterResiding a house is not on the code's list of permit-exempt work, so in Exeter plan on a building permit for siding replacement. The exemption covers finish work, painting, papering, tiling, carpet, cabinets, and small accessory structures, not the recladding of a building's exterior; the Exeter building department decides where the line between a patch and a replacement falls, and the contractor pulling the permit is expected to ask.Read more

No statewide licence covers siding contractors in New Hampshire, so the town's permit and inspection are the record that the work was done to code, with the contractor responsible under the statute for meeting it. If Exeter has a historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval first; the state code leaves those local ordinances in force.

Sources: International Residential Code 2024, Chapter 1 (ICC); RSA 155-A, New Hampshire Building Code (gc.nh.gov); OPLC: the licensing boards.

Full New Hampshire guide

Recent building permits in Exeter

1,389 permits on file across 22 months. Records through October 15, 2026, updated daily.

Last 90 days: 80 electrical, 64 building, 33 plumbing.

Permits commonly pulled in Exeter over the last twelve months: 320 electrical, 299 building, 137 plumbing and 1 gas permits.

Most recent building permits filed in Exeter, New Hampshire
FiledStreetType
Oct 15, 2026KINGSTON RDElectrical
Oct 15, 2026COURT STPlumbing
Oct 15, 2026HIGHLAND STPlumbing
Oct 15, 2026WHIPPOORWILL LNPlumbing
Oct 13, 2026HAMPTON RDElectrical
Oct 13, 2026PROSPECT STPlumbing
Oct 13, 2026SIGNATURE CIRCLEElectrical
Oct 8, 2026SIGNATURE CIRCLEBuilding
Oct 8, 2026ACADIA LN U108Plumbing
Oct 6, 2026KINGSTON RDBuilding
Oct 6, 2026SIGNATURE CIRCLEBuilding
Oct 5, 2026OAKLANDS RDElectrical
Oct 5, 2026WATER STBuilding
Oct 5, 2026HAVEN LNElectrical
Oct 5, 2026ROCKY HILL AVEElectrical
Oct 5, 2026SCHOOL STElectrical
Oct 5, 2026SIGNATURE CIRCLEElectrical
Oct 1, 2026HIGHLAND STElectrical
Oct 1, 2026BEECH HILL RDElectrical
Oct 1, 2026HIGHLAND STBuilding
Oct 1, 2026WEBSTER AVEBuilding
Sep 29, 2026LINDEN STElectrical
Sep 29, 2026PORTSMOUTH AVEElectrical
Sep 29, 2026LINDEN STBuilding
Sep 29, 2026BROOKSIDE DRElectrical
Sep 28, 2026BRENTWOOD RDBuilding
Sep 28, 2026LINDEN STBuilding
Sep 28, 2026LITTLE PINE LNBuilding
Sep 28, 2026CRESTVIEW DRElectrical
Sep 24, 2026HIGH STElectrical
Sep 24, 2026WADLEIGH STElectrical
Sep 24, 2026DRIFTWOOD CIRCLEElectrical
Sep 24, 2026ENERGY WAYElectrical
Sep 24, 2026CRAWFORD AVEElectrical
Sep 24, 2026SIGNATURE CIRCLEElectrical
Sep 24, 2026HARVARD STElectrical
Sep 24, 2026ROBIN LNElectrical
Sep 22, 2026LOCUST AVEBuilding
Sep 22, 2026PINE MEADOWS DRBuilding
Sep 22, 2026SUNFLOWER LNPlumbing
Sep 21, 2026BEECH HILL MH PKBuilding
Sep 21, 2026HEMLOCK STBuilding
Sep 21, 2026MAIN STPlumbing
Sep 21, 2026DOWNING CTBuilding
Sep 17, 2026ROBINHOOD DRBuilding
Sep 17, 2026ROBINHOOD DRBuilding
Sep 17, 2026PORTSMOUTH AVEElectrical
Sep 17, 2026WEBSTER AVEPlumbing
Sep 17, 2026LINCOLN STBuilding
Sep 17, 2026PAWS WAYElectrical

Get quotes from local contractors for a project in Exeter.

Monthly archive

Before you plan work in Exeter

Exeter's Building Department at the Town Office on Front Street does things in person: because construction projects vary so much, it requires applicants to sit down with department staff to obtain and fill out building, electrical and plumbing/gas applications, and electrical, plumbing and gas contractors present their trade licences at the same time. The building and electrical inspectors need 24 hours' notice, and scheduling every required inspection is the homeowner's or contractor's job, not the department's. The department also runs code enforcement and zoning administration, keeps the Zoning Board of Adjustment's case files for research, and its page states the town is operating under the 2015 International Building and Residential Codes as amended — well behind the state's current editions, so ask which edition a plan review will use.

Exeter has had a Historic District Commission since 1970, and the department is its front door: the commission administers Article 8 of the zoning ordinance for the town's historic districts, and questions about it go to the Building Department's phone line. The HDC publishes separate applications for a change to an existing structure, new construction and signage, and design guidelines chapter by chapter — roofing, exterior woodwork, masonry and stucco, windows and doors, site elements, and new construction and additions — along with its own analysis of the energy efficiency of historic windows and a guide to weatherizing a historic home, which is worth reading before a window or roofing contractor prices a job inside a district.

Sources: Town of Exeter — Building Department; Town of Exeter — Historic District Commission.

Towns near Exeter

Frequently asked questions

Do I need a permit to replace my furnace, boiler or AC in Exeter?

Yes. The New Hampshire building code requires a permit to install, alter or replace a mechanical, gas or electrical system, and only portable appliances and minor part replacements are exempt. Gas equipment is fuel gas fitting, licensed by the state's Mechanical Licensing Board; the wiring to a heat pump or condenser needs a licensed electrician, and Exeter issues the permits. The contractor doing the work normally pulls them.

Read the full New Hampshire guide
Do I need a permit to install a heat pump or mini split in New Hampshire?

Yes. The electrical connection is an electrical installation that needs a licensed electrician and an electrical permit from the town, and the equipment itself is mechanical work the code regulates. NHSaves rebates are the utility program's business, with their own equipment and paperwork conditions; they do not replace the permit.

Read the full New Hampshire guide
Do I need a permit to replace windows in New Hampshire?

Plan on it. Window and door replacement is not on the code's list of permit-exempt work, and the ordinary-repairs exception excludes anything that removes or changes a required egress, which a bedroom window is. Whether a same-size swap counts as an ordinary repair is the local building department's call.

Read the full New Hampshire guide
Do I need a permit to replace siding in New Hampshire?

Plan on it. Residing a house is not among the projects the code exempts from a permit; the exemption covers finish work like painting and tiling, not recladding the exterior. The local building department settles borderline cases and issues the permit.

Read the full New Hampshire guide
Do I need a permit to replace my roof in Exeter?

Yes. Re-roofing is not exempt under the New Hampshire building code, so Exeter will expect a building permit before the work starts, and the contractor is responsible under RSA 155-A for meeting the code's roofing requirements.

Read the full New Hampshire guide
How long is a building permit good for in New Hampshire?

Under the International Residential Code as adopted by New Hampshire (section R105.5), a permit becomes invalid if the work has not started within 180 days of issue, or if more than 180 days pass between inspections once work has begun; the building official may grant written extensions of up to 180 days at a time. An application that is filed but not pursued is treated as abandoned after 180 days.

Are building permits public record, and how do I look one up for an address in Exeter?

Yes, permits are public records. Ask the building department in Exeter how to search by address, or check the town's online portal if it has one. The recent filings table on this page shows the same public data with the street, date and permit type.

Can a homeowner pull their own permit in New Hampshire?

Often, yes. The code lets the owner apply for the building permit, and New Hampshire's licensing statutes let the owner-occupant of a single-family home do their own electrical installations and, in an existing single-family primary residence, their own fuel gas fitting: still under a permit, to code and with the town's inspection. A licence is required for anyone else doing that work. Most homeowners still let the contractor pull the permit, because the statute makes the contractor responsible for meeting the code on the work they do.

What happens if work is done without a permit?

The town can order the work stopped, opened up for inspection, corrected or removed, and the code provides penalties for building or altering without a permit. Unpermitted work also surfaces at sale, when a buyer's attorney searches the permit history. It is far cheaper to permit it the first time.

Explore New Hampshire

Are you a contractor?

Homeowners in Exeter ask this page for licensed heating, window, roofing and siding contractors. We pass those requests to local contractors by hand; email us to be one of them.

Email us to receive requests

Permit data for your business

Every Exeter permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.

See permit alert plans