Plymouth County, Massachusetts
Lakeville, MA Building Department and Permits
- The Lakeville Building Department is at 241 Main Street, Lakeville, MA 02347.
- Lakeville Building Department phone: 508-946-8804.
- Lakeville Building Department hours: Mon-Thu 8:00-4:30; Fri 8:00-12:00.
- Building permits in Lakeville are filed through OpenGov, the online permit portal.
- Lakeville is in Plymouth County, Massachusetts.
- Last verified 2026-09-16 against the Lakeville website.
Building Department
- Phone
- 508-946-8804
- Hours
- Mon-Thu 8:00-4:30; Fri 8:00-12:00
- Inspector of Buildings
- Nathan P. Darling, Building Commissioner
Verified 2026-09-16 against the official Lakeville website. Always confirm hours before visiting.
Do I need a permit in Lakeville, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Lakeville on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in LakevilleReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Lakeville building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in LakevilleReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Lakeville building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Lakeville has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in LakevilleRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Lakeville treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Lakeville building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in LakevilleResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Lakeville plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Lakeville building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Lakeville has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Lakeville
532 permits on file across 19 months. Records through July 30, 2026.
Last 90 days: 6 building, 3 gas, 2 mechanical.
Permits commonly pulled in Lakeville over the last twelve months: 205 building, 20 mechanical, 14 electrical, 9 demolition and 6 sheet metal permits.
| Filed | Street | Type |
|---|---|---|
| Jul 30, 2026 | STAPLES SHORE RD | Building |
| Jul 30, 2026 | QUEQUECHAN CIRCLE | Building |
| Jul 27, 2026 | BRISTOL ST | Gas |
| Jul 27, 2026 | RHODE ISLAND RD | Mechanical |
| Jul 26, 2026 | BRISTOL ST | Gas |
| Jul 26, 2026 | BRISTOL ST | Gas |
| Jul 26, 2026 | CHARBONNEAU AV | Building |
| Jul 24, 2026 | SOUTHWORTH ST | Mechanical |
| Jul 20, 2026 | POND LN | Building |
| Jul 20, 2026 | POND LN | Building |
| Jul 20, 2026 | HIGHLAND RD | Building |
| Jul 17, 2026 | HIGHLAND RD | Demolition |
| Jul 17, 2026 | DANIEL RD | Building |
| Jul 16, 2026 | CLEAR POND RD | Building |
| Jul 14, 2026 | NACHAOMET RD | Building |
| Jul 14, 2026 | HACKETT AV | Building |
| Jul 13, 2026 | SPRUCE ST | Gas |
| Jul 13, 2026 | BEDFORD ST | Building |
| Jul 12, 2026 | BEECHWOOD AV | Electrical |
| Jul 9, 2026 | HITCHING POST RD | Mechanical |
| Jul 9, 2026 | MALBONE ST | Building |
| Jul 9, 2026 | NACHAOMET RD | Building |
| Jul 8, 2026 | WILDWOOD RD | Building |
| Jul 7, 2026 | MALBONE ST | Building |
| Jul 6, 2026 | CROOKED LN | Electrical |
| Jul 3, 2026 | HOWLAND RD | Mechanical |
| Jul 1, 2026 | QUEQUECHAN CIRCLE | Building |
| Jul 1, 2026 | HACKETT AV | Mechanical |
| Jun 30, 2026 | FREETOWN ST | Building |
| Jun 30, 2026 | COUNTY ST | Building |
| Jun 29, 2026 | KENNETH W WELCH DR | Building |
| Jun 26, 2026 | CHARLES ST | Building |
| Jun 24, 2026 | SOUTHWORTH ST | Building |
| Jun 24, 2026 | MAIN ST | Building |
| Jun 24, 2026 | HILTZ AV | Building |
| Jun 23, 2026 | PIERCE AV | Building |
| Jun 18, 2026 | MORRISON WAY | Building |
| Jun 18, 2026 | LAKESIDE AV | Building |
| Jun 17, 2026 | LANDING WAY | Electrical |
| Jun 16, 2026 | PRECINCT ST | Building |
| Jun 16, 2026 | VAUGHAN ST | Demolition |
| Jun 12, 2026 | FOREST PARK DR | Building |
| Jun 10, 2026 | CROOKED LN | Building |
| Jun 10, 2026 | SOUTHWORTH ST | Building |
| Jun 10, 2026 | LANG ST | Building |
| Jun 8, 2026 | COUNTY ST | Building |
| Jun 7, 2026 | SURREY DR | Building |
| Jun 3, 2026 | MAIN ST | Building |
| Jun 3, 2026 | HEMLOCK SHORE RD | Building |
| Jun 3, 2026 | HOWLAND RD | Building |
Get quotes from local contractors for a project in Lakeville.
Monthly archive
Before you plan work in Lakeville
Lakeville's Building Department, at 241 Main Street, protects public safety in construction by making sure every construction, reconstruction, alteration, repair, moving or demolition of a building conforms to the state building, mechanical, electrical, plumbing and gas codes and the town's zoning bylaws. Permits are filed through the department's ViewPoint online permitting, with instructions posted; a paper application is still accepted but may delay the permit, and either way the state application must come with a copy of the licence, liability and workers' compensation insurance and a current email. The department posts its fee schedules, an inspection request procedure, swimming pool information, a link to check a construction licence, the zoning map and a change-of-address form. The office is open Monday to Thursday 8 to 4:30 and Friday 8 to noon. Nathan P. Darling is the Building Commissioner, Jay Catalano the Plumbing and Gas Inspector and Todd McNeill the Wiring Inspector.
Sources: Town of Lakeville — Building.
Towns near Lakeville
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Lakeville?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Lakeville may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Lakeville?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Lakeville will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Lakeville?
Yes, permits are public records. Lakeville uses OpenGov, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Lakeville ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Lakeville permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.
See permit alert plans