Bristol County, Massachusetts
Acushnet, MA Building Department and Permits
- The Acushnet Building Department is at 122 Main Street, Acushnet, MA 02743.
- Acushnet Building Department phone: 508-998-0225.
- Acushnet Building Department hours: Mon-Fri 8:00-4:00.
- Building permits in Acushnet are filed through PeopleGIS Simplicity, the online permit portal.
- Acushnet is in Bristol County, Massachusetts.
- Last verified 2026-09-16 against the Acushnet website.
Building Department
- Phone
- 508-998-0225
- Hours
- Mon-Fri 8:00-4:00
- Inspector of Buildings
- Thomas Currie, Building Commissioner/Zoning Enforcement Officer
Verified 2026-09-16 against the official Acushnet website. Always confirm hours before visiting.
Do I need a permit in Acushnet, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Acushnet on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in AcushnetReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Acushnet building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in AcushnetReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Acushnet building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Acushnet has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in AcushnetRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Acushnet treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Acushnet building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in AcushnetResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Acushnet plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Acushnet building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Acushnet has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Acushnet
2,536 permits on file across 22 months. Records through October 15, 2026, updated daily.
Last 90 days: 230 building, 146 electrical, 61 plumbing, 42 gas, 16 sheet metal.
Permits commonly pulled in Acushnet over the last twelve months: 788 building, 445 electrical, 167 plumbing, 142 gas and 29 sheet metal permits.
| Filed | Street | Type |
|---|---|---|
| Oct 15, 2026 | FAIRFIELD STREET | Plumbing |
| Oct 15, 2026 | SOUTH MAIN STREET | Building |
| Oct 15, 2026 | ASHLEY LANE | Building |
| Oct 15, 2026 | DONNA LANE | Building |
| Oct 15, 2026 | MILL ROAD | Building |
| Oct 15, 2026 | FAIRFIELD STREET | Gas |
| Oct 15, 2026 | SANDPIPER LANE | Plumbing |
| Oct 14, 2026 | LAWSON AVENUE | Building |
| Oct 14, 2026 | MAIN STREET | Building |
| Oct 14, 2026 | LAURA KEENE AVENUE | Building |
| Oct 14, 2026 | SOUTH MAIN STREET UNIT B2 | Building |
| Oct 14, 2026 | WEST HILL DRIVE | Building |
| Oct 14, 2026 | MAIN STREET | Building |
| Oct 14, 2026 | LAURA KEENE AVENUE | Building |
| Oct 13, 2026 | LAWSON AVENUE | Building |
| Oct 13, 2026 | PECKHAM ROAD | Building |
| Oct 12, 2026 | SOUTH MAIN STREET | Building |
| Oct 12, 2026 | MENDALL ROAD | Electrical |
| Oct 12, 2026 | SOUTH MAIN STREET | Building |
| Oct 12, 2026 | MENDALL ROAD | Electrical |
| Oct 9, 2026 | PECKHAM ROAD | Building |
| Oct 9, 2026 | Main Street | Gas |
| Oct 9, 2026 | Main Street | Plumbing |
| Oct 9, 2026 | MIDDLE ROAD | Building |
| Oct 9, 2026 | Main Street | Gas |
| Oct 9, 2026 | MAIN STREET | Sheet Metal |
| Oct 9, 2026 | Main Street | Plumbing |
| Oct 9, 2026 | PECKHAM ROAD | Building |
| Oct 9, 2026 | MAIN STREET | Sheet Metal |
| Oct 8, 2026 | MIDDLE ROAD | Gas |
| Oct 8, 2026 | MENDALL ROAD | Building |
| Oct 8, 2026 | MIDDLE ROAD | Gas |
| Oct 7, 2026 | ELLIS ROAD | Gas |
| Oct 7, 2026 | WAMSUTTA AVENUE | Sheet Metal |
| Oct 7, 2026 | MALLORY STREET | Gas |
| Oct 7, 2026 | MALLORY STREET | Gas |
| Oct 7, 2026 | ELLIS ROAD | Gas |
| Oct 7, 2026 | WAMSUTTA AVENUE | Electrical |
| Oct 6, 2026 | MAIN STREET | Electrical |
| Oct 6, 2026 | KEENE ROAD | Electrical |
| Oct 6, 2026 | HATHAWAY ROAD | Building |
| Oct 6, 2026 | MAIN STREET | Electrical |
| Oct 5, 2026 | FRANK STREET | Building |
| Oct 5, 2026 | TRIPP'S WAY | Electrical |
| Oct 5, 2026 | MIDDLE ROAD | Building |
| Oct 5, 2026 | TRIPP'S WAY | Electrical |
| Oct 5, 2026 | NESTLES LANE | Building |
| Oct 5, 2026 | MIDDLE ROAD | Plumbing |
| Oct 5, 2026 | FRANK STREET | Building |
| Oct 5, 2026 | MIDDLE ROAD | Plumbing |
Get quotes from local contractors for a project in Acushnet.
Monthly archive
- Oct 202668
- Sep 2026158
- Aug 2026183
- Jul 2026172
- Jun 2026166
- May 2026171
- Apr 2026199
- Mar 2026117
- Feb 202670
- Jan 202667
- Dec 202573
- Nov 202579
- Oct 2025105
- Sep 2025125
- Aug 202595
- Jul 2025106
- Jun 202594
- May 2025111
- Apr 2025102
- Mar 2025123
- Feb 202569
- Jan 202583
Construction permits by month in Acushnet
Construction permits filed in Acushnet each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 83 | 69 | 123 | 102 | 111 | 94 | 106 | 95 | 125 | 105 | 79 | 73 |
| 2026 | 66 | 70 | 100 | 110 | 90 | 97 | 103 | 107 | 124 |
Before you plan work in Acushnet
Acushnet's Building Department, at 122 Main Street, is where the Building Commissioner enforces the state building code and the town bylaws and oversees the use and occupancy of every building, structure and parcel in town; it issues building, electrical, gas, plumbing, wood and pellet stove and demolition permits and schedules the inspections. Its advice is to visit or call the code official first — the questions will be what you plan to do and where — so the requirements are explained before the application goes in, and the department says that first contact heads off problems that cost time and money. Permits are filed through the town's PeopleGIS online portal; a paper application is accepted for an additional fee and may delay the permit, and either way the application must be complete and come with a copy of the licence, the certificate of insurance, the state workers' compensation affidavit and a current email address. The office is open weekdays 8 to 4. Thomas Currie is Building Commissioner and Zoning Enforcement Officer.
Sources: Town of Acushnet — Building Department.
Towns near Acushnet
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Acushnet?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Acushnet may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Acushnet?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Acushnet will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Acushnet?
Yes, permits are public records. Acushnet uses PeopleGIS Simplicity, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Acushnet ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Acushnet permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.
See permit alert plans