permits.llc

Plymouth County, Massachusetts

Hingham, MA Building Department and Permits

Building Department

Hours
Mon, Wed, Thu 7:00-5:00; Tue 7:00-7:00
Inspector of Buildings
Michael J. Clancy, Building Commissioner

Verified 2026-09-16 against the official Hingham website.

Do I need a permit in Hingham, and who pulls it?

In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.

The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.

Need a licensed contractor? See HVAC, roofing and other contractors serving Hingham on Mass Home Comfort.

Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.

Heating and cooling in HinghamReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more

The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Hingham building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.

Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.

If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.

Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.

Full Massachusetts guide
Windows and doors in HinghamReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more

Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Hingham building department makes, so ask before assuming.

In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.

If Hingham has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide
Roofing in HinghamRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Hingham treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more

The state's guidance is that the registered contractor applies for the permit, not you.

The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Hingham building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.

Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.

Full Massachusetts guide
Siding in HinghamResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Hingham plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Hingham building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more

On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.

If Hingham has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide

Recent building permits in Hingham

5,927 permits on file across 22 months. Records through October 15, 2026, updated daily.

Last 90 days: 218 building, 215 electrical, 147 plumbing, 106 gas, 36 sheet metal.

Permits commonly pulled in Hingham over the last twelve months: 1,099 building, 875 electrical, 588 plumbing, 430 gas and 144 sheet metal permits.

Most recent building permits filed in Hingham, Massachusetts
FiledStreetType
Oct 15, 2026crowes laneElectrical
Oct 14, 2026butler roadBuilding
Oct 14, 2026shipyard driveGas
Oct 14, 2026central streetPlumbing
Oct 14, 2026burditt avenuePlumbing
Oct 13, 2026hersey streetPlumbing
Oct 13, 2026lincoln streetElectrical
Oct 13, 2026westview circlePlumbing
Oct 13, 2026aberdeen roadPlumbing
Oct 13, 2026aberdeen roadGas
Oct 13, 2026franklin rodgers rdGas
Oct 13, 2026hersey streetGas
Oct 13, 2026fulling mill laneElectrical
Oct 13, 2026high streetSheet Metal
Oct 13, 2026huckleberry hill lanBuilding
Oct 12, 2026hillside terraceBuilding
Oct 12, 2026prospect streetElectrical
Oct 12, 2026cedar streetSheet Metal
Oct 12, 2026clubhouse drivePlumbing
Oct 12, 2026wompatuck roadElectrical
Oct 12, 2026charles streetElectrical
Oct 12, 2026club house drElectrical
Oct 12, 2026ritter roadBuilding
Oct 12, 2026popes laneGas
Oct 9, 2026governor andrew rdGas
Oct 9, 2026seal cove laneElectrical
Oct 9, 2026hancock roadGas
Oct 9, 2026franklin rodgers rdGas
Oct 9, 2026wompatuck roadElectrical
Oct 8, 2026beal streetGas
Oct 8, 2026south pleasant stSheet Metal
Oct 8, 2026stagecoach roadElectrical
Oct 8, 2026shipyard drivePlumbing
Oct 8, 2026foley beach roadSheet Metal
Oct 8, 2026governor long roadPlumbing
Oct 8, 2026merrymount roadElectrical
Oct 8, 2026anderson roadSheet Metal
Oct 7, 2026stagecoach roadElectrical
Oct 7, 2026park view driveElectrical
Oct 7, 2026garrison roadPlumbing
Oct 7, 2026central streetElectrical
Oct 7, 2026tuckers lanePlumbing
Oct 7, 2026howe streetElectrical
Oct 7, 2026tuckers laneElectrical
Oct 6, 2026backriver roadPlumbing
Oct 6, 2026thaxter streetPlumbing
Oct 6, 2026main stPlumbing
Oct 6, 2026main streetPlumbing
Oct 6, 2026lincoln streetElectrical
Oct 6, 2026weir streetElectrical

Get quotes from local contractors for a project in Hingham.

Monthly archive

Construction permits by month in Hingham

Construction permits filed in Hingham each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.

Construction permits filed per month in Hingham, 2025 and 2026
YearJanFebMarAprMayJunJulAugSepOctNovDec
2025252247312302281277298363284278264207
2026188215320339270314280261200

Before you plan work in Hingham

Hingham's Building Department at 210 Central Street administers and enforces the state building, electrical, plumbing and architectural access codes together with the town's zoning and general by-laws. It issues the permits to construct, repair and maintain property, issues certificates of occupancy for new and change-of-use buildings, and inspects restaurants, assembly and school uses annually. The department makes a point of its records: they are open to the public so a buyer can check a property's legal occupancy, code compliance and any complaints before purchasing, and the town posts a running report of building permits recently issued alongside a search of all building permits. Its office hours, in force since July 2024, are 7 a.m. to 5 p.m. on Monday, Wednesday and Thursday and 7 a.m. to 7 p.m. on Tuesday. Michael J. Clancy is the Building Commissioner, and the department's posted documents include its building inspections rules and regulations, building permit requirements, a workers' compensation affidavit and a demolition sign-off form.

Sources: Town of Hingham — Building Department.

Towns near Hingham

Frequently asked questions

Do I need a permit to replace my furnace, boiler or AC in Hingham?

Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Hingham may require a mechanical permit for the equipment. The licensed contractor pulls these permits.

Read the full Massachusetts guide
Do I need a permit to install a heat pump or mini split in Massachusetts?

Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.

Read the full Massachusetts guide
Do I need a permit to replace windows in Massachusetts?

Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.

Read the full Massachusetts guide
Do I need a permit to replace siding in Massachusetts?

Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.

Read the full Massachusetts guide
Do I need a permit to replace my roof in Hingham?

Yes. Re-roofing is not exempt under the Massachusetts building code, so Hingham will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.

Read the full Massachusetts guide
How long is a building permit good for in Massachusetts?

Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.

Read the full Massachusetts guide
Are building permits public record, and how do I look one up for an address in Hingham?

Yes, permits are public records. Hingham uses PermitEyes, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.

Read the full Massachusetts guide
Can a homeowner pull their own permit?

Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.

Read the full Massachusetts guide
What happens if work is done without a permit?

The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.

Explore Massachusetts

Are you a contractor?

Homeowners in Hingham ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.

Get listed on masshomecomfort.com

Permit data for your business

Every Hingham permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.

See permit alert plans