Norfolk County, Massachusetts
Cohasset, MA Building Department and Permits
- Cohasset Building & Inspections is at Town Hall, 41 Highland Avenue, Cohasset, MA 02025.
- Cohasset Building & Inspections phone: 781-383-4100 ext. 5103.
- Building permits in Cohasset are filed through PermitEyes, the online permit portal.
- Cohasset is in Norfolk County, Massachusetts.
- Last verified 2026-09-16 against the Cohasset website.
Building & Inspections
- Inspector of Buildings
- John Hallin, Director of Planning, Permits & Inspections
Verified 2026-09-16 against the official Cohasset website. Always confirm hours before visiting.
Do I need a permit in Cohasset, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Cohasset on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in CohassetReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Cohasset building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in CohassetReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Cohasset building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Cohasset has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in CohassetRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Cohasset treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Cohasset building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in CohassetResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Cohasset plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Cohasset building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Cohasset has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Cohasset
3,164 permits on file across 22 months. Records through October 16, 2026, updated daily.
Last 90 days: 187 building, 116 electrical, 56 gas, 50 plumbing, 13 sheet metal.
Permits commonly pulled in Cohasset over the last twelve months: 1,043 building, 436 electrical, 208 plumbing, 203 gas and 40 sheet metal permits.
| Filed | Street | Type |
|---|---|---|
| Oct 16, 2026 | bayberry ln | Gas |
| Oct 16, 2026 | mohawk way | Building |
| Oct 16, 2026 | south main st | Electrical |
| Oct 16, 2026 | james ln | Electrical |
| Oct 16, 2026 | south main st | Electrical |
| Oct 15, 2026 | aaron river rd | Electrical |
| Oct 15, 2026 | adams rd | Building |
| Oct 15, 2026 | beechwood st | Electrical |
| Oct 15, 2026 | atlantic ave | Building |
| Oct 15, 2026 | hammond ave | Electrical |
| Oct 15, 2026 | adams rd | Building |
| Oct 15, 2026 | nichols rd | Gas |
| Oct 15, 2026 | nichols rd | Plumbing |
| Oct 14, 2026 | atlantic ave | Electrical |
| Oct 14, 2026 | pond st | Plumbing |
| Oct 14, 2026 | north main st | Electrical |
| Oct 14, 2026 | pond st | Building |
| Oct 14, 2026 | forest notch | Building |
| Oct 14, 2026 | howe rd | Building |
| Oct 14, 2026 | south main st | Building |
| Oct 14, 2026 | test test | Building |
| Oct 14, 2026 | wheelwright farm | Plumbing |
| Oct 14, 2026 | rustic dr | Building |
| Oct 13, 2026 | nahatan st | Building |
| Oct 13, 2026 | jerusalem rd | Sheet Metal |
| Oct 13, 2026 | jerusalem rd | Electrical |
| Oct 13, 2026 | stockbridge st | Gas |
| Oct 13, 2026 | walnut hill lane | Building |
| Oct 13, 2026 | beach st | Electrical |
| Oct 13, 2026 | jerusalem rd | Plumbing |
| Oct 13, 2026 | sohier st | Gas |
| Oct 13, 2026 | beechwood | Electrical |
| Oct 12, 2026 | aaron river rd | Building |
| Oct 12, 2026 | hill st | Plumbing |
| Oct 11, 2026 | fairoaks ln | Building |
| Oct 9, 2026 | stockbridge st | Electrical |
| Oct 9, 2026 | red gate ln | Electrical |
| Oct 9, 2026 | doane st | Building |
| Oct 9, 2026 | hill st | Plumbing |
| Oct 9, 2026 | 1-3-5 south main st | Building |
| Oct 9, 2026 | howard gleason rd | Building |
| Oct 9, 2026 | ocean ledge drive | Electrical |
| Oct 8, 2026 | beechwood st | Electrical |
| Oct 8, 2026 | pond st | Building |
| Oct 8, 2026 | hull st | Building |
| Oct 8, 2026 | hill st | Building |
| Oct 8, 2026 | linden dr | Gas |
| Oct 8, 2026 | forest ave | Building |
| Oct 8, 2026 | beach st | Building |
| Oct 7, 2026 | stockbridge st | Electrical |
Get quotes from local contractors for a project in Cohasset.
Monthly archive
- Oct 202683
- Sep 2026139
- Aug 2026130
- Jul 2026214
- Jun 2026240
- May 2026186
- Apr 2026191
- Mar 2026131
- Feb 202689
- Jan 2026112
- Dec 2025190
- Nov 2025186
- Oct 2025135
- Sep 2025134
- Aug 2025172
- Jul 2025136
- Jun 2025105
- May 2025127
- Apr 2025152
- Mar 2025114
- Feb 202590
- Jan 2025108
Construction permits by month in Cohasset
Construction permits filed in Cohasset each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 107 | 88 | 104 | 143 | 111 | 89 | 108 | 107 | 120 | 113 | 100 | 110 |
| 2026 | 97 | 81 | 119 | 140 | 116 | 144 | 113 | 112 | 124 |
Before you plan work in Cohasset
Cohasset's Building and Inspections Department, at Town Hall, 41 Highland Avenue, administers and enforces the state building, electrical, plumbing and architectural access codes and the town's zoning and general bylaws, inspects various buildings and establishments annually, issues certificates of occupancy for new and change-of-use properties, and performs the zoning, building, electrical, plumbing and gas inspections. It has converted to electronic permitting (PermitEyes): every building permit is filed online, the town posts a video on using the system and a public portal for looking permits up, and it keeps a running archive of building permit logs. All inspections are arranged through the department; the office is attended during Town Hall hours but the inspectors are often in the field, so the town suggests calling before coming in for a particular inspector. Its posted documents include a pre-permitting procedure guide, the required documents for a building permit, the HIC law affidavit that supplements a permit, forms for a construction supervisor assuming or withdrawing from a project, the Historic Commission's certificate of appropriateness application, and the town's policy on measuring building height. John Hallin is the Director of Planning, Permits and Inspections.
Towns near Cohasset
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Cohasset?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Cohasset may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Cohasset?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Cohasset will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Cohasset?
Yes, permits are public records. Cohasset uses PermitEyes, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Cohasset ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Cohasset permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.