Essex County, Massachusetts
North Andover, MA Building Department and Permits
- The North Andover Building Department is at 120 Main Street, North Andover, MA 01845.
- North Andover Building Department phone: 978-688-9545.
- North Andover Building Department hours: Mon, Wed, Thu 8:00-4:30; Tue 8:00-6:00; Fri 8:00-12:00.
- Building permits in North Andover are filed through OpenGov, the online permit portal.
- North Andover is in Essex County, Massachusetts.
- Last verified 2026-09-16 against the North Andover website.
Building Department
- Phone
- 978-688-9545
- Hours
- Mon, Wed, Thu 8:00-4:30; Tue 8:00-6:00; Fri 8:00-12:00
- Inspector of Buildings
- Scott Vandewalle, Building Commissioner
Verified 2026-09-16 against the official North Andover website. Always confirm hours before visiting.
Do I need a permit in North Andover, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving North Andover on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in North AndoverReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your North Andover building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in North AndoverReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the North Andover building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If North Andover has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in North AndoverRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in North Andover treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the North Andover building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in North AndoverResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in North Andover plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the North Andover building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If North Andover has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in North Andover
1,434 permits on file across 19 months. Records through July 31, 2026.
Last 90 days: 25 building, 6 plumbing, 5 gas, 1 electrical.
Permits commonly pulled in North Andover over the last twelve months: 624 building, 61 gas, 50 electrical and 31 plumbing permits.
| Filed | Street | Type |
|---|---|---|
| Jul 31, 2026 | OSGOOD STREET | Building |
| Jul 30, 2026 | ABBOTT STREET | Gas |
| Jul 30, 2026 | TURNPIKE STREET | Gas |
| Jul 30, 2026 | HILLSIDE ROAD | Building |
| Jul 29, 2026 | MARENGO STREET | Plumbing |
| Jul 29, 2026 | BOXFORD STREET | Building |
| Jul 29, 2026 | OLD CART WAY | Building |
| Jul 29, 2026 | SANDRA LANE | Building |
| Jul 29, 2026 | SANDRA LANE | Building |
| Jul 29, 2026 | BOXFORD STREET | Building |
| Jul 28, 2026 | DUDLEY STREET | Plumbing |
| Jul 28, 2026 | THISTLE ROAD | Plumbing |
| Jul 27, 2026 | THIRD STREET | Building |
| Jul 27, 2026 | THIRD STREET | Building |
| Jul 27, 2026 | SALEM STREET | Building |
| Jul 27, 2026 | BEECH STREET | Gas |
| Jul 27, 2026 | UNION STREET | Electrical |
| Jul 27, 2026 | LACY STREET | Building |
| Jul 24, 2026 | OSGOOD STREET | Building |
| Jul 24, 2026 | AMBERVILLE ROAD | Building |
| Jul 24, 2026 | AMBERVILLE ROAD | Building |
| Jul 23, 2026 | STERLING LANE | Building |
| Jul 22, 2026 | ELM COURT | Plumbing |
| Jul 22, 2026 | GREAT POND ROAD | Building |
| Jul 22, 2026 | SALEM STREET | Building |
| Jul 22, 2026 | GLENNCREST DRIVE | Gas |
| Jul 22, 2026 | BARKER STREET | Building |
| Jul 21, 2026 | MAIN STREET | Building |
| Jul 21, 2026 | TURNPIKE STREET | Building |
| Jul 21, 2026 | BARKER STREET | Building |
| Jul 21, 2026 | EMPIRE DRIVE | Gas |
| Jul 21, 2026 | EMPIRE DRIVE | Plumbing |
| Jul 21, 2026 | WAVERLY ROAD | Building |
| Jul 20, 2026 | STEVENS STREET | Building |
| Jul 20, 2026 | PRESCOTT STREET | Building |
| Jul 20, 2026 | PHEASANT BROOK ROAD | Building |
| Jul 20, 2026 | EDGELAWN AVENUE | Plumbing |
| Jul 17, 2026 | Beechwood Drive | Building |
| Jul 17, 2026 | AMBERVILLE ROAD | Building |
| Jul 17, 2026 | JOHNSON STREET | Plumbing |
| Jul 16, 2026 | SILSBEE ROAD | Building |
| Jul 16, 2026 | LONG PASTURE ROAD | Building |
| Jul 16, 2026 | BRUIN HILL ROAD | Building |
| Jul 15, 2026 | LONG PASTURE ROAD | Building |
| Jul 15, 2026 | PETERSON ROAD | Building |
| Jul 15, 2026 | OSGOOD STREET | Building |
| Jul 15, 2026 | LONG PASTURE ROAD | Building |
| Jul 15, 2026 | CHESTNUT STREET | Building |
| Jul 15, 2026 | PETERSON ROAD | Building |
| Jul 15, 2026 | ROCK ROAD | Building |
Get quotes from local contractors for a project in North Andover.
Permits by type in North Andover
Monthly archive
Before you plan work in North Andover
North Andover's Building Department, at 120 Main Street, enforces 780 CMR and the Zoning Act, Chapter 40A, together with the applicable sections of the town code, and issues permits for every kind of construction — schools, institutional buildings, businesses, commercial and industrial buildings, dormitories, multi-family and single-family dwellings, pools, chimneys, signs, additions and alterations — as well as carrying out the periodic inspections for certificates of inspection under Table 108 of the code. Its electrical inspector reviews electrical plans for new buildings and enforces the fire alarm regulations for new homes, and its plumbing and gas inspector issues the permits for gas piping, plumbing and sewer work under M.G.L. c. 142 and performs the final inspection before a certificate of occupancy. Applications are filed online through OpenGov. The office is open Monday, Wednesday and Thursday 8 to 4:30, Tuesday 8 to 6 and Friday 8 to noon; the building inspectors are in weekdays 8 to 10 a.m. and Monday to Thursday 1 to 2 p.m. or by appointment, and the electrical, plumbing and gas inspectors Monday to Thursday 7:30 to 9 a.m. Scott Vandewalle is the Building Commissioner.
The department's FAQ answers the questions it gets most: a fence over six feet needs a building permit and may sit close to the property line as long as nothing crosses it; a pool needs a self-closing, self-latching fence as soon as it can hold water, and its setbacks depend on the zoning district and section 4.2.4 of the bylaw, so bring a plot plan; a lot is buildable only after an inspector reviews a certified plot plan and confirms the minimum area is one-hundred-percent contiguous upland; work on a property in the Historic District goes to the Historic District Commission first; and every wiring job, small ones included, needs a permit pulled by a Massachusetts-licensed electrician — homeowners may not do their own electrical work.
Sources: Town of North Andover — Building Department; Town of North Andover — Building Department FAQ.
Towns near North Andover
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in North Andover?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and North Andover may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in North Andover?
Yes. Re-roofing is not exempt under the Massachusetts building code, so North Andover will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in North Andover?
Yes, permits are public records. North Andover uses OpenGov, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in North Andover ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every North Andover permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.
See permit alert plans