Middlesex County, Massachusetts
Framingham, MA Building Department and Permits
- The Framingham Inspectional Services Division is at Memorial Building, 150 Concord Street, Room 203, Framingham, MA 01702.
- Framingham Inspectional Services Division phone: 508-532-5500. Email: building.dept@framinghamma.gov.
- Framingham Inspectional Services Division hours: Mon/Wed/Thu 8:30-5:00; Tue 8:30-7:00; Fri 8:30-12:30.
- Building permits in Framingham are filed through OpenGov, the online permit portal.
- Framingham is in Middlesex County, Massachusetts.
- Last verified 2026-09-16 against the Framingham website.
Inspectional Services Division
- Phone
- 508-532-5500
- Hours
- Mon/Wed/Thu 8:30-5:00; Tue 8:30-7:00; Fri 8:30-12:30
- Inspector of Buildings
- Fred Bray, Director of Inspectional Services/Building Commissioner
Verified 2026-09-16 against the official Framingham website. Always confirm hours before visiting.
Do I need a permit in Framingham, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Framingham on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in FraminghamReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Framingham building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in FraminghamReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Framingham building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Framingham has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in FraminghamRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Framingham treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Framingham building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in FraminghamResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Framingham plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Framingham building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Framingham has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Framingham
3,703 permits on file across 19 months. Records through July 31, 2026.
Last 90 days: 72 building, 27 gas, 11 sheet metal, 7 electrical, 4 plumbing, 1 demolition.
Permits commonly pulled in Framingham over the last twelve months: 1,792 building, 288 gas, 160 sheet metal, 84 plumbing and 59 electrical permits.
| Filed | Street | Type |
|---|---|---|
| Jul 31, 2026 | SPRUCE ST | Demolition |
| Jul 30, 2026 | Blandin Ave | Building |
| Jul 30, 2026 | WORCESTER RD | Sheet Metal |
| Jul 30, 2026 | West Farm Pond Road | Sheet Metal |
| Jul 30, 2026 | STATE ST | Building |
| Jul 30, 2026 | CENTRAL ST | Building |
| Jul 30, 2026 | CLAUDETTE CIR | Building |
| Jul 30, 2026 | WORCESTER RD | Building |
| Jul 30, 2026 | STATE ST | Building |
| Jul 30, 2026 | JODIE RD | Building |
| Jul 30, 2026 | JODIE RD | Building |
| Jul 30, 2026 | DAYTONA AVE | Building |
| Jul 30, 2026 | BISHOP DR | Building |
| Jul 29, 2026 | West Farm Pond Road | Gas |
| Jul 29, 2026 | Hollis Street | Building |
| Jul 29, 2026 | CONCORD TERR | Gas |
| Jul 29, 2026 | SIMPSON DR | Gas |
| Jul 29, 2026 | EDGELL RD | Gas |
| Jul 29, 2026 | GREGORY RD | Building |
| Jul 29, 2026 | OLD CONN PATH | Building |
| Jul 29, 2026 | WAYSIDE INN RD | Building |
| Jul 29, 2026 | Hollis Street | Building |
| Jul 29, 2026 | OAKWOOD CT | Building |
| Jul 29, 2026 | OAKWOOD CT | Building |
| Jul 29, 2026 | CROSSING BLVD | Building |
| Jul 28, 2026 | COUNTRY FARM RD | Sheet Metal |
| Jul 28, 2026 | COUNTRY FARM RD | Sheet Metal |
| Jul 28, 2026 | JOCLYN AVE | Sheet Metal |
| Jul 28, 2026 | PARKER RD | Gas |
| Jul 28, 2026 | FRANKLIN ST | Gas |
| Jul 28, 2026 | ABERDEEN RD | Gas |
| Jul 28, 2026 | TRIPP ST | Building |
| Jul 28, 2026 | COVE AVE | Building |
| Jul 28, 2026 | MASS TURNPIKE | Building |
| Jul 28, 2026 | CURTIS RD | Building |
| Jul 28, 2026 | NORTH ST | Sheet Metal |
| Jul 28, 2026 | LEXINGTON ST | Plumbing |
| Jul 27, 2026 | CIDER MILL RD | Sheet Metal |
| Jul 27, 2026 | LORING DR | Gas |
| Jul 27, 2026 | BEAVER ST | Gas |
| Jul 27, 2026 | MAYFLOWER RD | Gas |
| Jul 27, 2026 | BARBER RD | Building |
| Jul 27, 2026 | TRAVIS DR | Building |
| Jul 27, 2026 | PEARL ST | Building |
| Jul 27, 2026 | GRANT ST | Plumbing |
| Jul 27, 2026 | BERKELEY RD | Building |
| Jul 27, 2026 | AGNES DR | Building |
| Jul 27, 2026 | OAK ST | Gas |
| Jul 27, 2026 | NEW YORK AVE | Building |
| Jul 27, 2026 | DENNISON AVE | Building |
Get quotes from local contractors for a project in Framingham.
Permits by type in Framingham
Monthly archive
Before you plan work in Framingham
Framingham's Inspectional Services Division, in Room 203 of the Memorial Building at 150 Concord Street, moved its permitting and licensing to OpenGov on 1 July 2025; a single account tracks permits, payments and messages with staff. The building division's online permits cover the full building permit application and a residential short form, demolition and shed permits, the electrical, gas fitter, mechanical, plumbing and sheet metal trade permits, sign permits and foreclosed property registration, and the division still posts its paper forms — including the certificate of inspection application, pool permit, solid-fuel stove permit, the initial and final construction control documents, and an application to amend an existing permit — for filing at Room 203, with the fee due at the time of application. The office is open Monday, Wednesday and Thursday 8:30 to 5, Tuesday 8:30 to 7 and Friday 8:30 to 12:30; the inspectors are in Monday, Wednesday and Thursday 8:30 to 9:30 a.m. and 4 to 5 p.m., and Friday 8:30 to 9:30 and 11:30 to 12:30. Fred Bray is the Director of Inspectional Services and Building Commissioner.
Sources: City of Framingham — Inspectional Services applications; City of Framingham — Inspectional Services.
Towns near Framingham
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Framingham?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Framingham may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Framingham?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Framingham will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Framingham?
Yes, permits are public records. Framingham uses OpenGov, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Framingham ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Framingham permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.
See permit alert plans