Hampden County, Massachusetts
Chicopee, MA Building Department and Permits
- The Chicopee Building Department is at 115 Baskin Drive, 2nd Floor, Chicopee, MA 01020.
- Chicopee Building Department phone: 413-594-1440.
- Chicopee Building Department hours: Mon-Fri 7:00-5:00; inspectors 7-9 AM and 1-2 PM.
- Building permits in Chicopee are filed through PermitEyes, the online permit portal.
- Chicopee is in Hampden County, Massachusetts.
- Last verified 2026-09-16 against the Chicopee website.
Building Department
- Phone
- 413-594-1440
- Hours
- Mon-Fri 7:00-5:00; inspectors 7-9 AM and 1-2 PM
Verified 2026-09-16 against the official Chicopee website. Always confirm hours before visiting.
Do I need a permit in Chicopee, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Chicopee on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in ChicopeeReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Chicopee building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in ChicopeeReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Chicopee building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Chicopee has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in ChicopeeRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Chicopee treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Chicopee building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in ChicopeeResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Chicopee plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Chicopee building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Chicopee has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Chicopee
6,566 permits on file across 22 months. Records through October 16, 2026, updated daily.
Last 90 days: 538 building, 293 electrical, 155 plumbing, 99 gas, 5 mechanical, 3 sheet metal.
Permits commonly pulled in Chicopee over the last twelve months: 1,894 building, 936 electrical, 531 plumbing, 409 gas and 29 sheet metal permits.
| Filed | Street | Type |
|---|---|---|
| Oct 16, 2026 | beaudry ave | Electrical |
| Oct 16, 2026 | hudson ave | Building |
| Oct 16, 2026 | keddy blvd | Building |
| Oct 16, 2026 | mockingbird drive | Building |
| Oct 16, 2026 | ward st | Gas |
| Oct 16, 2026 | bay state rd | Building |
| Oct 16, 2026 | beaudry ave | Building |
| Oct 16, 2026 | ward st | Plumbing |
| Oct 16, 2026 | lorraine st | Electrical |
| Oct 16, 2026 | woodcrest cir | Building |
| Oct 16, 2026 | granby rd | Plumbing |
| Oct 16, 2026 | oakwood st | Plumbing |
| Oct 15, 2026 | lorraine st | Plumbing |
| Oct 15, 2026 | ferry st | Gas |
| Oct 15, 2026 | church st | Electrical |
| Oct 15, 2026 | james st | Electrical |
| Oct 15, 2026 | lorraine st | Electrical |
| Oct 15, 2026 | montcalm st | Electrical |
| Oct 15, 2026 | garland st | Building |
| Oct 15, 2026 | crestwood st | Gas |
| Oct 15, 2026 | fuller rd | Plumbing |
| Oct 15, 2026 | grattan | Building |
| Oct 15, 2026 | east st | Building |
| Oct 15, 2026 | fuller rd | Electrical |
| Oct 15, 2026 | montgomery street | Gas |
| Oct 15, 2026 | sixth ave | Building |
| Oct 15, 2026 | memorial dr | Electrical |
| Oct 15, 2026 | grattan st | Plumbing |
| Oct 15, 2026 | tolpa circle | Electrical |
| Oct 15, 2026 | ducharme ave | Electrical |
| Oct 15, 2026 | lynwood dr | Building |
| Oct 15, 2026 | poplar st | Building |
| Oct 15, 2026 | harding st | Building |
| Oct 14, 2026 | ginger dr | Electrical |
| Oct 14, 2026 | pendleton ave | Building |
| Oct 14, 2026 | boulay cir | Building |
| Oct 14, 2026 | boileau ter | Electrical |
| Oct 14, 2026 | west st | Electrical |
| Oct 14, 2026 | state st | Building |
| Oct 14, 2026 | pendleton ave | Building |
| Oct 14, 2026 | pheasant way | Building |
| Oct 14, 2026 | new ludlow rd | Electrical |
| Oct 14, 2026 | grove st | Building |
| Oct 14, 2026 | burnett rd | Building |
| Oct 14, 2026 | pendleton ave | Building |
| Oct 14, 2026 | pheasant way | Building |
| Oct 14, 2026 | doverbrrok rd | Building |
| Oct 14, 2026 | memorial dr | Electrical |
| Oct 14, 2026 | memorial dr | Building |
| Oct 14, 2026 | citron dr | Electrical |
Get quotes from local contractors for a project in Chicopee.
Monthly archive
- Oct 2026279
- Sep 2026320
- Aug 2026351
- Jul 2026387
- Jun 2026336
- May 2026326
- Apr 2026313
- Mar 2026328
- Feb 2026260
- Jan 2026250
- Dec 2025267
- Nov 2025326
- Oct 2025294
- Sep 2025263
- Aug 2025251
- Jul 2025334
- Jun 2025279
- May 2025349
- Apr 2025333
- Mar 2025263
- Feb 2025179
- Jan 2025278
Construction permits by month in Chicopee
Construction permits filed in Chicopee each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 247 | 160 | 228 | 296 | 324 | 245 | 229 | 224 | 226 | 255 | 269 | 223 |
| 2026 | 205 | 204 | 266 | 262 | 278 | 280 | 345 | 294 | 276 |
Before you plan work in Chicopee
Chicopee's Building Department, on the second floor of 115 Baskin Drive, oversees every building permit and inspection in the city through its building, electrical, gas and plumbing divisions: it inspects buildings for safety and code compliance, issues building permits and certificates of inspection and occupancy, and reviews plans for zoning and code compliance, with each inspector checking construction against the current codes of their trade. Permits are filed through the city's electronic permit management system on PermitEyes, which covers building, electrical, plumbing and gas permits, certificates of occupancy and Fire Department permits and inspection requests; an account takes a few minutes to set up, instructions are posted, and a public kiosk at the department and computers at the library serve anyone without one. Complaints go to the department on its complaint form. The office opens to the public at 7 a.m. and runs to 5, and the inspectors keep office hours 7 to 9 a.m. and 1 to 2 p.m.
Sources: City of Chicopee — Building Department; City of Chicopee — Online permits and licences.
Towns near Chicopee
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Chicopee?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Chicopee may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Chicopee?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Chicopee will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Chicopee?
Yes, permits are public records. Chicopee uses PermitEyes, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Chicopee ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Chicopee permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.
See permit alert plans