Barnstable County, Massachusetts
Brewster, MA Building Department and Permits
- The Brewster Building Department is at Brewster Town Offices, 2198 Main Street, Brewster, MA 02631.
- Brewster Building Department phone: 508-896-3701 ext. 1125. Email: building@brewster-ma.gov.
- Brewster Building Department hours: Mon-Thu 8:30-4:00 (walk-in); Fri 8:30-4:00 (phone & email only).
- Building permits in Brewster are filed through OpenGov, the online permit portal.
- Brewster is in Barnstable County, Massachusetts.
- Last verified 2026-09-16 against the Brewster website.
Building Department
- Hours
- Mon-Thu 8:30-4:00 (walk-in); Fri 8:30-4:00 (phone & email only)
- Inspector of Buildings
- Tom Delaney, Building Commissioner
Verified 2026-09-16 against the official Brewster website. Always confirm hours before visiting.
Do I need a permit in Brewster, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Brewster on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in BrewsterReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Brewster building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in BrewsterReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Brewster building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Brewster has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in BrewsterRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Brewster treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Brewster building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in BrewsterResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Brewster plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Brewster building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Brewster has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Brewster
602 permits on file across 19 months. Records through July 29, 2026.
Last 90 days: 14 building.
Permits commonly pulled in Brewster over the last twelve months: 278 building, 9 plumbing, 6 gas and 2 electrical permits.
| Filed | Street | Type |
|---|---|---|
| Jul 29, 2026 | RED MAPLE ROAD | Building |
| Jul 27, 2026 | MAIN STREET | Building |
| Jul 27, 2026 | MAIN STREET | Building |
| Jul 27, 2026 | MAIN STREET | Building |
| Jul 27, 2026 | FLETCHER LANE | Building |
| Jul 27, 2026 | MAIN STREET | Building |
| Jul 27, 2026 | FOX CROSSING ROAD | Building |
| Jul 24, 2026 | MAIN STREET | Building |
| Jul 22, 2026 | SEAWAY ROAD | Building |
| Jul 22, 2026 | EVELYNS DRIVE | Building |
| Jul 22, 2026 | LUND FARM WAY | Building |
| Jul 22, 2026 | MAIN STREET | Building |
| Jul 21, 2026 | BROOK TRAIL ROAD | Building |
| Jul 21, 2026 | WILDWOOD ROAD | Building |
| Jul 18, 2026 | SUSAN LANE | Building |
| Jul 17, 2026 | FREEMANS WAY | Building |
| Jul 17, 2026 | EVELYNS DRIVE | Building |
| Jul 17, 2026 | TUBMAN ROAD | Building |
| Jul 16, 2026 | HINCKLEY ROAD | Building |
| Jul 16, 2026 | HARWICH ROAD | Building |
| Jul 15, 2026 | STONY BROOK ROAD | Building |
| Jul 15, 2026 | OLD MEADOW ROAD | Building |
| Jul 14, 2026 | Main Street | Building |
| Jul 13, 2026 | MAIN STREET | Building |
| Jul 13, 2026 | MAIN STREET | Building |
| Jul 13, 2026 | PROPRIETORS CARTWAY | Building |
| Jul 10, 2026 | AMBERGRIS CIRCLE | Building |
| Jul 9, 2026 | CROSBY LANE | Building |
| Jul 8, 2026 | MAIN STREET | Building |
| Jul 8, 2026 | MAIN STREET | Building |
| Jul 8, 2026 | CROSBY LANE | Building |
| Jul 7, 2026 | CROSBY LANE | Building |
| Jul 7, 2026 | MILL POND DRIVE | Building |
| Jul 3, 2026 | LONG POND ROAD | Building |
| Jul 2, 2026 | SOUTH ORLEANS ROAD | Building |
| Jul 2, 2026 | THOUSAND OAKS DRIVE | Building |
| Jul 2, 2026 | HAMILTON CARTWAY | Building |
| Jul 1, 2026 | SEAMANS LANE | Building |
| Jul 1, 2026 | EPHS CARTWAY | Building |
| Jul 1, 2026 | CROSBY LANE | Building |
| Jun 29, 2026 | HARWICH ROAD | Building |
| Jun 29, 2026 | AMBERGRIS CIRCLE | Building |
| Jun 26, 2026 | MARSHVIEW LANE | Building |
| Jun 26, 2026 | CLIFF POND ROAD | Building |
| Jun 25, 2026 | MAIN STREET | Building |
| Jun 25, 2026 | MAIN STREET | Building |
| Jun 23, 2026 | UNDERPASS ROAD | Building |
| Jun 20, 2026 | HOWES ROAD | Building |
| Jun 16, 2026 | SATUCKET ROAD | Building |
| Jun 16, 2026 | FOX MEADOW DRIVE | Building |
Get quotes from local contractors for a project in Brewster.
Monthly archive
Before you plan work in Brewster
Brewster's Building Department, in the Town Offices at 2198 Main Street within Community Planning and Land Use Management, administers building permits, inspections and enforcement under 780 CMR and the Architectural Access Board regulations, the electrical, plumbing and gas permits coordinated with them, and the zoning bylaw; it is also the town's FEMA floodplain administrator, helps enforce the stormwater management bylaw with stormwater inspections tied to the building permit, and administers the Old King's Highway Regional Historic District Act with the town's Old King's Highway Committee. Permits are filed through OpenGov, with a step-by-step guide posted, but inspection requests are not accepted through it: building inspections are scheduled at least 24 hours ahead by email or phone and run Monday to Friday, while electrical, gas and plumbing inspections are requested on written inspection request forms emailed or brought to the department — never to the inspectors directly. The electrical inspector is part-time, receiving forms in office hours Monday and Thursday 10 to 11 a.m. and inspecting weekdays; the gas and plumbing inspector keeps office hours Wednesday and Friday 8:30 to 9:30 and inspects only on those days. Records of permits on a property are requested by email, phone or in person, processed on Fridays when Town Hall is closed to the public and viewable at the counter from the following Monday, though files never leave the building; some records are in OpenGov. The office is open for walk-ins Monday to Thursday 8:30 to 4 and by phone and email on Friday. Tom Delaney is the Building Commissioner and Richard Kirchner the Local Building Inspector.
Sources: Town of Brewster — Building Department.
Towns near Brewster
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Brewster?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Brewster may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Brewster?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Brewster will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Brewster?
Yes, permits are public records. Brewster uses OpenGov, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Brewster ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Brewster permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.
See permit alert plans