Middlesex County, Massachusetts
Belmont, MA Building Department and Permits
- The Belmont Building Division is at 19 Moore Street, 2nd Floor, Belmont, MA 02478.
- Belmont Building Division phone: 617-993-2650.
- Belmont Building Division hours: Inspector office hours Mon 8-10 & 4-6; Tue-Fri 8-10.
- Building permits in Belmont are filed through PeopleGIS Simplicity, the online permit portal.
- Belmont is in Middlesex County, Massachusetts.
- Last verified 2026-09-16 against the Belmont website.
Building Division
- Phone
- 617-993-2650
- Hours
- Inspector office hours Mon 8-10 & 4-6; Tue-Fri 8-10
- Inspector of Buildings
- Ara Yogurtian, Inspector of Buildings
Verified 2026-09-16 against the official Belmont website. Always confirm hours before visiting.
Do I need a permit in Belmont, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Belmont on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in BelmontReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Belmont building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in BelmontReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Belmont building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Belmont has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in BelmontRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Belmont treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Belmont building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in BelmontResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Belmont plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Belmont building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Belmont has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Belmont
5,820 permits on file across 22 months. Records through October 15, 2026, updated daily.
Last 90 days: 444 building, 340 electrical, 225 plumbing, 113 gas, 64 sheet metal, 1 demolition.
Permits commonly pulled in Belmont over the last twelve months: 1,428 building, 982 electrical, 728 plumbing, 403 gas and 219 sheet metal permits.
| Filed | Street | Type |
|---|---|---|
| Oct 15, 2026 | ORCHARD ST | Building |
| Oct 15, 2026 | LANTERN RD | Building |
| Oct 15, 2026 | BEECH ST | Building |
| Oct 15, 2026 | LEWIS RD, UNIT 44 | Building |
| Oct 15, 2026 | STONY BROOK RD | Building |
| Oct 15, 2026 | THOMAS ST | Electrical |
| Oct 15, 2026 | ORCHARD ST | Electrical |
| Oct 15, 2026 | OAK ST | Sheet Metal |
| Oct 14, 2026 | WINN ST | Building |
| Oct 14, 2026 | ORCHARD ST | Building |
| Oct 14, 2026 | CUSHING AVE | Building |
| Oct 14, 2026 | OAKLEY RD, UNIT 118 | Building |
| Oct 14, 2026 | SHAW RD | Building |
| Oct 14, 2026 | HORNE RD | Gas |
| Oct 14, 2026 | UNITY AVE, UNIT 32 | Plumbing |
| Oct 14, 2026 | MARSH ST | Plumbing |
| Oct 14, 2026 | CROSS ST | Plumbing |
| Oct 14, 2026 | BIRCH HILL RD | Building |
| Oct 14, 2026 | BEECH ST | Gas |
| Oct 14, 2026 | WAVERLEY ST | Plumbing |
| Oct 14, 2026 | HORNE RD | Plumbing |
| Oct 14, 2026 | CROSS ST | Plumbing |
| Oct 14, 2026 | BEECH ST | Plumbing |
| Oct 13, 2026 | JONATHAN ST | Building |
| Oct 13, 2026 | OAKLEY RD | Electrical |
| Oct 13, 2026 | CONCORD AVE | Electrical |
| Oct 13, 2026 | UNITY AVE | Plumbing |
| Oct 13, 2026 | PEQUOSSETTE RD | Building |
| Oct 13, 2026 | RUTLEDGE RD | Building |
| Oct 13, 2026 | TROWBRIDGE ST | Building |
| Oct 13, 2026 | OAKLEY RD | Electrical |
| Oct 13, 2026 | UPLAND RD | Electrical |
| Oct 13, 2026 | GILBERT RD | Gas |
| Oct 13, 2026 | GILBERT RD | Plumbing |
| Oct 13, 2026 | LAWRENCE LN | Sheet Metal |
| Oct 13, 2026 | COTTAGE ST | Building |
| Oct 13, 2026 | MILL ST, POWER | Building |
| Oct 13, 2026 | SCHOOL ST | Gas |
| Oct 13, 2026 | SCHOOL ST | Plumbing |
| Oct 13, 2026 | HORNE RD | Electrical |
| Oct 13, 2026 | LAWRENCE LN | Electrical |
| Oct 13, 2026 | STULTS RD | Plumbing |
| Oct 12, 2026 | OAKLEY RD | Electrical |
| Oct 12, 2026 | SCHOOL ST | Gas |
| Oct 12, 2026 | BEATRICE CIR | Gas |
| Oct 12, 2026 | BEATRICE CIR | Plumbing |
| Oct 12, 2026 | WATERHOUSE RD | Building |
| Oct 12, 2026 | HILLCREST RD | Building |
| Oct 12, 2026 | OAKLEY RD | Electrical |
| Oct 12, 2026 | SHADY BROOK LN | Gas |
Get quotes from local contractors for a project in Belmont.
Monthly archive
- Oct 2026196
- Sep 2026432
- Aug 2026379
- Jul 2026391
- Jun 2026417
- May 2026402
- Apr 2026402
- Mar 2026238
- Feb 2026200
- Jan 2026202
- Dec 2025203
- Nov 2025225
- Oct 2025238
- Sep 2025247
- Aug 2025267
- Jul 2025187
- Jun 2025209
- May 2025210
- Apr 2025242
- Mar 2025205
- Feb 2025171
- Jan 2025157
Construction permits by month in Belmont
Construction permits filed in Belmont each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.
| Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025 | 157 | 171 | 205 | 242 | 210 | 209 | 187 | 267 | 247 | 238 | 225 | 203 |
| 2026 | 201 | 195 | 222 | 254 | 243 | 248 | 231 | 229 | 358 |
Before you plan work in Belmont
Belmont's Building Division, on the second floor of 19 Moore Street, enforces the state building code and the town's zoning bylaw, and asks that additions, structural work and anything that adds habitable space or bedrooms be submitted in person to the building inspector during office hours — Monday 8 to 10 a.m. and 4 to 6 p.m., Tuesday to Friday 8 to 10 — with building inspections starting at 10 a.m. Monday to Thursday. Its review covers code and zoning compliance and a check with the Treasurer that both the owner and the contractor are paid up on town taxes. Any work that needs heavy equipment — anything more than a shovel — also needs a street opening permit from Engineering, and building, electrical and plumbing and gas inspections are scheduled in sequence for the permitted scope. An open permit with no action for 180 days is treated as abandoned under section 105.5 of 780 CMR. The division's FAQ settles the common questions: a shed under 150 square feet needs only a certified plot plan showing its location, a larger one a building permit as well, and both must meet the lot-area and accessory-building setback rules in sections 4.2.1 and 4.3.5 of the zoning bylaw; the town has no fence regulations of its own and defers to the state code, so a fence under 7 feet needs no permit, though corner lots must observe the corner clearance rule in section 4.3.7; painting, wallpapering and replacing a few shingles are ordinary repairs needing no permit; and window replacement does need one, because it is an energy conservation matter under the code. Ara Yogurtian is the Inspector of Buildings and Slater Panosian the Local Building Inspector.
Sources: Town of Belmont — Building Division.
Towns near Belmont
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Belmont?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Belmont may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Belmont?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Belmont will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Belmont?
Yes, permits are public records. Belmont uses PeopleGIS Simplicity, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Belmont ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Belmont permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.
See permit alert plans