permits.llc

Norfolk County, Massachusetts

Bellingham, MA Building Department and Permits

  • The Bellingham Inspectional Services is at Bellingham Municipal Center, 10 Mechanic Street, Bellingham, MA 02019.
  • Bellingham Inspectional Services phone: 508-966-5821.
  • Bellingham Inspectional Services hours: Monday through Thursday, 7 am to 4:30 pm, Friday, 7 am to 1 pm.
  • Building permits in Bellingham are filed through PermitEyes, the online permit portal.
  • Bellingham is in Norfolk County, Massachusetts.
  • Last verified 2026-09-17 against the Bellingham website.

Inspectional Services

Hours
Monday through Thursday, 7 am to 4:30 pm, Friday, 7 am to 1 pm
Inspector of Buildings
Caleb Moody, Director of Inspectional Services Inspector of Buildings / Zoning Agent

Verified 2026-09-17 against the official Bellingham website.

Do I need a permit in Bellingham, and who pulls it?

In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.

The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.

Need a licensed contractor? See HVAC, roofing and other contractors serving Bellingham on Mass Home Comfort.

Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.

Heating and cooling in BellinghamReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more

The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Bellingham building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.

Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.

If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.

Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.

Full Massachusetts guide
Windows and doors in BellinghamReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more

Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Bellingham building department makes, so ask before assuming.

In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.

If Bellingham has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide
Roofing in BellinghamRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Bellingham treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more

The state's guidance is that the registered contractor applies for the permit, not you.

The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Bellingham building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.

Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.

Full Massachusetts guide
Siding in BellinghamResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Bellingham plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Bellingham building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more

On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.

If Bellingham has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.

Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.

Full Massachusetts guide

Recent building permits in Bellingham

4,890 permits on file across 22 months. Records through October 16, 2026, updated daily.

Last 90 days: 404 building, 201 electrical, 101 plumbing, 72 gas, 35 mechanical.

Permits commonly pulled in Bellingham over the last twelve months: 1,493 building, 672 electrical, 335 plumbing, 242 gas and 109 mechanical permits.

Most recent building permits filed in Bellingham, Massachusetts
FiledStreetType
Oct 16, 2026kingmanBuilding
Oct 16, 2026wrentham rdBuilding
Oct 16, 2026south main stBuilding
Oct 16, 2026lake stBuilding
Oct 16, 2026highridge rdElectrical
Oct 16, 2026barrett lnElectrical
Oct 15, 2026pulaski blvd.Building
Oct 15, 2026bruce rdBuilding
Oct 15, 2026wrentham rdPlumbing
Oct 15, 2026pulaski blvd.Building
Oct 15, 2026high street suite 4 18Building
Oct 15, 2026old bridge lnPlumbing
Oct 15, 2026depot stElectrical
Oct 15, 2026blackstone stElectrical
Oct 15, 2026greenbriar lnElectrical
Oct 15, 2026greenbriar lnGas
Oct 15, 2026countryside rdBuilding
Oct 15, 2026north main stElectrical
Oct 15, 2026mary stBuilding
Oct 15, 2026jeannine rdPlumbing
Oct 15, 2026old bridge lnGas
Oct 15, 2026pulaski bvMechanical
Oct 15, 2026north main stBuilding
Oct 14, 2026pulaski bvBuilding
Oct 14, 2026pulaski bvBuilding
Oct 14, 2026mechanic stBuilding
Oct 14, 2026taunton stGas
Oct 14, 2026candlelight lnBuilding
Oct 14, 2026north main stBuilding
Oct 14, 2026hartford avBuilding
Oct 14, 2026shirley rdElectrical
Oct 14, 2026lake stBuilding
Oct 14, 2026ruthellen rdElectrical
Oct 14, 2026indian run rdBuilding
Oct 14, 2026shirley rdBuilding
Oct 14, 2026barrett lnElectrical
Oct 14, 2026taunton stElectrical
Oct 14, 2026hartford avBuilding
Oct 14, 2026ruthellen rdBuilding
Oct 14, 2026wethersfield rdBuilding
Oct 14, 2026ruthellen rdElectrical
Oct 14, 2026ruthellen rdElectrical
Oct 14, 2026ruthellen rdBuilding
Oct 14, 2026south maple stBuilding
Oct 14, 2026north main stBuilding
Oct 14, 2026annmarie drElectrical
Oct 13, 2026south main stPlumbing
Oct 13, 2026lizotte driveBuilding
Oct 13, 2026hartford avBuilding
Oct 13, 2026elm streetBuilding

Get quotes from local contractors for a project in Bellingham.

Permits by type in Bellingham

Monthly archive

Construction permits by month in Bellingham

Construction permits filed in Bellingham each month, counted the way our Massachusetts building permit reports count them across 45 municipalities: by filing date (by issue date in Boston and Reading), licences and inspections excluded. That is why these totals are lower than the monthly archive above.

Construction permits filed per month in Bellingham, 2025 and 2026
YearJanFebMarAprMayJunJulAugSepOctNovDec
2025175163184230197218186163237209173150
2026159119219190224215219229246

Before you plan work in Bellingham

Bellingham's Inspectional Services Department, in the Municipal Center at 10 Mechanic Street, gathers the building inspectors, the health agent and inspectors, the weights and measures inspector, the inspectors of wires, the plumbing and gas inspectors and the zoning inspectors under one director, who is also the Inspector of Buildings and Zoning Agent. It enforces the state building and sanitary codes, the fuel gas, plumbing and electrical codes, the Architectural Access Board regulations and the town's own code and zoning bylaws, and it rules on the mode, manner and materials of construction, alteration, repair, demolition and equipment installation, and on the use and occupancy of every building in town. The office is staffed Monday to Thursday 7 a.m. to 4:30 p.m. and Friday 7 a.m. to 1 p.m.; permits are filed through the town's PermitEyes online system. Caleb Moody is the Director of Inspectional Services and Inspector of Buildings.

Sources: Town of Bellingham — Inspectional Services.

Towns near Bellingham

Frequently asked questions

Do I need a permit to replace my furnace, boiler or AC in Bellingham?

Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Bellingham may require a mechanical permit for the equipment. The licensed contractor pulls these permits.

Read the full Massachusetts guide
Do I need a permit to install a heat pump or mini split in Massachusetts?

Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.

Read the full Massachusetts guide
Do I need a permit to replace windows in Massachusetts?

Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.

Read the full Massachusetts guide
Do I need a permit to replace siding in Massachusetts?

Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.

Read the full Massachusetts guide
Do I need a permit to replace my roof in Bellingham?

Yes. Re-roofing is not exempt under the Massachusetts building code, so Bellingham will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.

Read the full Massachusetts guide
How long is a building permit good for in Massachusetts?

Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.

Read the full Massachusetts guide
Are building permits public record, and how do I look one up for an address in Bellingham?

Yes, permits are public records. Bellingham uses PermitEyes, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.

Read the full Massachusetts guide
Can a homeowner pull their own permit?

Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.

Read the full Massachusetts guide
What happens if work is done without a permit?

The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.

Explore Massachusetts

Are you a contractor?

Homeowners in Bellingham ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.

Get listed on masshomecomfort.com

Permit data for your business

Every Bellingham permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.

See permit alert plans