Hampshire County, Massachusetts
Amherst, MA Building Department and Permits
- The Amherst Inspection Services is at Town Hall, 4 Boltwood Avenue, Amherst, MA 01002.
- Amherst Inspection Services phone: 413-259-3030.
- Amherst Inspection Services hours: Mon-Fri 8:00-4:30.
- Building permits in Amherst are filed through OpenGov, the online permit portal.
- Amherst is in Hampshire County, Massachusetts.
- Last verified 2026-09-16 against the Amherst website.
Inspection Services
- Phone
- 413-259-3030
- Hours
- Mon-Fri 8:00-4:30
- Inspector of Buildings
- Robert Morra, Building Commissioner
Verified 2026-09-16 against the official Amherst website. Always confirm hours before visiting.
Do I need a permit in Amherst, and who pulls it?
In Massachusetts, most permits are pulled by the licensed contractor doing the work, not the homeowner. For one- and two-family homes the state building code requires a licensed construction supervisor or a registered design professional to oversee construction, and for existing owner-occupied one- to four-family homes the contractor must also be registered with the Home Improvement Contractor program.
The homeowner exception is narrow. The building code lets an owner-occupant of a one- or two-family home apply for a building permit for work on their own home, but it applies to building permits only: electrical work may only be done by a master or journeyman electrician licensed by the state, and plumbing and gas work only by a licensed plumber or gas fitter, each under a permit issued to that licensee. It also has a cost the state warns about directly: a homeowner who pulls the building permit themselves may not be eligible for the Guaranty Fund if the contractor's work goes wrong.
Need a licensed contractor? See HVAC, roofing and other contractors serving Amherst on Mass Home Comfort.
Sources: When is a Construction Supervisor License required?; Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; Electricians consumer fact sheet; Plumbers and gas fitters consumer fact sheet.
Heating and cooling in AmherstReplacing a furnace, boiler, water heater or central air conditioner, or installing a heat pump or ductless mini split, is licensed work in Massachusetts. Anything on the gas side, a gas furnace, boiler, water heater or range connection, is gas fitting, and the state issues gas-fitting permits only to a licensed plumber or gas fitter.Read more
The electrical side of a heat pump, mini split or AC condenser needs an electrical permit pulled by a licensed electrician. Your Amherst building department may also require a mechanical permit for the equipment itself; the contractor pulls that too.
Heating and cooling installers are one of the trades mass.gov specifically exempts from Home Improvement Contractor registration, so do not expect an HIC number from an HVAC company. What you should expect is a gas-fitter or plumber licence for gas equipment and an electrician's licence for the wiring, with a permit on file for each.
If you are counting on a Mass Save rebate for a heat pump, the equipment must be installed by a contractor participating in the Mass Save Heat Pump Installer Network. A permit trail is part of how that work is documented, so an unlicensed, unpermitted install can cost you the rebate as well as the inspection.
Sources: Plumbers and gas fitters consumer fact sheet; Electricians consumer fact sheet; HIC Homeowner Resources; Air source heat pump rebates.
Full Massachusetts guideWindows and doors in AmherstReplacing windows or exterior doors is not on the list of work the Massachusetts building code exempts from a permit, so plan on one. The code's own exemption for "ordinary repairs" does not cover anything that removes or changes a required means of egress, which is exactly what a bedroom window is, and changing the size of an opening is an alteration to the structure.Read more
Whether a strict like-for-like swap in the same opening counts as an ordinary repair is a call the Amherst building department makes, so ask before assuming.
In an existing owner-occupied one- to four-family home, the contractor who replaces your windows or doors must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor pulls the building permit. A written contract is required by law for any home improvement job over $1,000, and the contractor may not collect more than one-third of the price up front.
If Amherst has a local historic district, exterior window and door changes there usually need the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRoofing in AmherstRe-roofing and roof replacement are not among the projects the Massachusetts building code exempts from a permit, so in Amherst treat a roof job as permitted work. Because the work touches the building's structure and weather envelope, it is overseen by a licensed construction supervisor, and on an existing owner-occupied one- to four-family home the roofing contractor must also hold Home Improvement Contractor registration.Read more
The state's guidance is that the registered contractor applies for the permit, not you.
The building code has specific requirements for roof coverings, underlayment and ice protection that the inspector checks against, and they depend on the roof type and the edition of the code in force. Rather than quote them here, ask the Amherst building department what it inspects for on a re-roof; the contractor pulling the permit is expected to know.
Sources: Massachusetts State Building Code, 780 CMR; When is a Construction Supervisor License required?; HIC Homeowner Resources.
Full Massachusetts guideSiding in AmherstResiding a house is not on the list of work the Massachusetts building code exempts from a permit, so in Amherst plan on a building permit for siding replacement. The code's "ordinary repairs" exemption is meant for patching what is there, not stripping and recladding the envelope, and the Amherst building department decides where that line falls; the contractor pulling the permit is expected to ask.Read more
On an existing owner-occupied one- to four-family home the siding contractor must be registered as a Home Improvement Contractor, and the state's guidance is that the registered contractor applies for the permit rather than the homeowner. A written contract is required by law for any home improvement job over $1,000, with no more than one-third of the price collected up front.
If Amherst has a local historic district, a change of siding material or profile on a building inside it usually needs the historic district commission's approval before the building permit issues. That is a town rule, not the state code, so check with the building department.
Sources: Massachusetts State Building Code, 780 CMR; HIC Homeowner Resources; When is a Construction Supervisor License required?.
Full Massachusetts guideRecent building permits in Amherst
1,719 permits on file across 19 months. Records through July 30, 2026.
Last 90 days: 29 building, 8 gas, 3 demolition, 2 plumbing, 1 sheet metal.
Permits commonly pulled in Amherst over the last twelve months: 746 building, 67 gas, 38 sheet metal, 36 demolition and 26 plumbing permits.
| Filed | Street | Type |
|---|---|---|
| Jul 30, 2026 | NEWELL COURT | Building |
| Jul 30, 2026 | PINE GROVE | Gas |
| Jul 30, 2026 | NEWELL COURT | Building |
| Jul 30, 2026 | PELHAM ROAD | Building |
| Jul 30, 2026 | PELHAM ROAD | Building |
| Jul 30, 2026 | PRESIDENTS DRIVE | Plumbing |
| Jul 29, 2026 | CHESTNUT STREET | Building |
| Jul 29, 2026 | DICKINSON STREET | Demolition |
| Jul 29, 2026 | STRONG STREET | Building |
| Jul 29, 2026 | ROLLING RIDGE ROAD | Building |
| Jul 29, 2026 | BAY ROAD | Gas |
| Jul 29, 2026 | LEVERETT ROAD | Building |
| Jul 29, 2026 | PRESIDENTS DRIVE | Plumbing |
| Jul 28, 2026 | MIDDLE STREET | Building |
| Jul 28, 2026 | OLYMPIA DRIVE | Building |
| Jul 27, 2026 | LEVERETT ROAD | Building |
| Jul 27, 2026 | WEST POMEROY LANE | Building |
| Jul 26, 2026 | TEAWADDLE LANE | Building |
| Jul 24, 2026 | NORTH PLEASANT STREET | Building |
| Jul 24, 2026 | MAIN STREET | Building |
| Jul 24, 2026 | BELCHERTOWN ROAD | Gas |
| Jul 24, 2026 | BELCHERTOWN ROAD | Gas |
| Jul 23, 2026 | SOUTH PLEASANT STREET | Demolition |
| Jul 23, 2026 | HICKS WAY | Building |
| Jul 23, 2026 | WILDFLOWER DRIVE | Gas |
| Jul 23, 2026 | FLAT HILLS ROAD | Gas |
| Jul 22, 2026 | NORTHAMPTON ROAD | Demolition |
| Jul 22, 2026 | EDGEHILL PLACE | Sheet Metal |
| Jul 22, 2026 | PULPIT HILL ROAD | Building |
| Jul 22, 2026 | HILLCREST PLACE | Building |
| Jul 22, 2026 | CAMPUS CENTER WAY | Building |
| Jul 22, 2026 | SOUTH PROSPECT STREET | Building |
| Jul 22, 2026 | PULPIT HILL ROAD | Building |
| Jul 21, 2026 | NORTH PLEASANT STREET | Building |
| Jul 21, 2026 | MEADOW STREET | Gas |
| Jul 21, 2026 | CAMPUS CENTER WAY | Building |
| Jul 21, 2026 | CANTON AVENUE | Building |
| Jul 21, 2026 | WILDFLOWER DRIVE | Building |
| Jul 20, 2026 | LINCOLN AVENUE | Building |
| Jul 20, 2026 | SOUTH EAST STREET | Building |
| Jul 20, 2026 | LINCOLN AVENUE | Building |
| Jul 20, 2026 | SOUTH EAST STREET | Building |
| Jul 19, 2026 | TOWN COMMON | Gas |
| Jul 17, 2026 | TOWN COMMON | Building |
| Jul 17, 2026 | PULPIT HILL ROAD | Building |
| Jul 17, 2026 | MONTAGUE ROAD | Building |
| Jul 17, 2026 | MONTAGUE ROAD | Building |
| Jul 17, 2026 | MONTAGUE ROAD | Building |
| Jul 17, 2026 | MONTAGUE ROAD | Building |
| Jul 16, 2026 | AMITY STREET | Gas |
Get quotes from local contractors for a project in Amherst.
Permits by type in Amherst
Monthly archive
Before you plan work in Amherst
Amherst's Inspection Services Department, at Town Hall, 4 Boltwood Avenue within Conservation and Development, administers the general laws and town bylaws on land use and the construction and occupancy of buildings. Permits are filed through the town's OpenGov portal, inspections are scheduled by phone, and the department's permit administrator is available to discuss current and upcoming projects. It publishes a monthly report of building permits issued with a full archive, links the state's CSL, HIC, electrical, plumbing and gas, sheet metal and septic inspector licence lookups, runs a multi-family certificate of inspection program, and has posted guidance for construction sites in town. The office is open weekdays 8 to 4:30. Rob Morra is Building Commissioner and Assistant Director of Conservation and Development.
Sources: Town of Amherst — Inspection Services.
Towns near Amherst
Frequently asked questions
Do I need a permit to replace my furnace, boiler or AC in Amherst?
Yes. A gas furnace, boiler or water heater is gas-fitting work, and Massachusetts issues gas permits only to a licensed plumber or gas fitter. Central AC and heat pumps need an electrical permit pulled by a licensed electrician, and Amherst may require a mechanical permit for the equipment. The licensed contractor pulls these permits.
Read the full Massachusetts guideDo I need a permit to install a heat pump or mini split in Massachusetts?
Yes. The state's guidance is that a ductless mini split is regulated equipment and needs a building permit, and the wiring needs an electrical permit from a licensed electrician. A ducted system adds a sheet metal permit for the ductwork. If you want the Mass Save rebate, the system must also be installed by a contractor in the Mass Save Heat Pump Installer Network.
Read the full Massachusetts guideDo I need a permit to replace windows in Massachusetts?
Plan on it. Window and door replacement is not on the building code's list of permit-exempt work, and anything that changes a bedroom egress window or the size of an opening is never exempt. Whether a same-size swap counts as an ordinary repair is the local building department's call. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit.
Read the full Massachusetts guideDo I need a permit to replace siding in Massachusetts?
Plan on it. Residing a house is not among the projects the Massachusetts building code exempts from a permit, and the "ordinary repairs" exemption covers patching, not recladding. On an owner-occupied one- to four-family home the contractor must be a registered Home Improvement Contractor and should pull the permit; the local building department settles borderline cases.
Read the full Massachusetts guideDo I need a permit to replace my roof in Amherst?
Yes. Re-roofing is not exempt under the Massachusetts building code, so Amherst will expect a building permit, pulled by a licensed construction supervisor. On an owner-occupied one- to four-family home the roofer must also hold Home Improvement Contractor registration.
Read the full Massachusetts guideHow long is a building permit good for in Massachusetts?
Under 780 CMR 105.5, a permit becomes invalid if the work has not started within 180 days of issue, or if the work is suspended or abandoned for 180 days once begun; the building official can extend it in writing for up to 180 days at a time on a written request made before it expires. An application that is filed but not pursued is treated as abandoned after 180 days, with extensions of up to 90 days at a time.
Read the full Massachusetts guideAre building permits public record, and how do I look one up for an address in Amherst?
Yes, permits are public records. Amherst uses OpenGov, linked at the top of this page, where you can search by address. The recent filings table on this page shows the same public data with the street, date and permit type.
Read the full Massachusetts guideCan a homeowner pull their own permit?
Sometimes, and it is usually a mistake. The state building code lets the owner-occupant of a one- or two-family home apply for a building permit for their own home, but never for electrical, plumbing or gas work, which only the licensee may do under their own permit. Mass.gov also warns that a homeowner who pulls the building permit may lose eligibility for the Guaranty Fund if a registered contractor's work goes wrong. Let the contractor pull it.
Read the full Massachusetts guideWhat happens if work is done without a permit?
The town can order the work stopped, opened up for inspection, corrected, or removed, and unpermitted work surfaces at sale when a buyer's attorney searches the permit history. For electrical work the state's own advice is to hire a licensed electrician to review it, pull a permit for it, and bring it up to code. It is far cheaper to permit it the first time.
Explore Massachusetts
Are you a contractor?
Homeowners in Amherst ask this page for licensed heating, window, roofing and siding contractors. Get listed on masshomecomfort.com and receive those requests.
Get listed on masshomecomfort.comPermit data for your business
Every Amherst permit above, with the contractor name, valuation, house number and work description, delivered daily by permit type and niche.
See permit alert plans