Which New Hampshire Towns Take Building Permits Online?
Only 31 of New Hampshire's 234 towns list an online permit portal. Most take a paper or PDF form by email, mail or in person. See the count by county.
By the permits.llc team · Last reviewed November 26, 2026
Only 31 of New Hampshire's 234 cities and towns list an online permit portal, according to our directory of every building department in the state, checked against each town's website in September 2026. Everywhere else, you or your contractor apply on a paper or PDF form, sent by email, by mail or handed in at the building department or town office.
That is about one town in eight. And even the word "online" means different things in different places, as the state's three largest cities show.
How many New Hampshire towns have an online permit portal?
Thirty-one, and they cluster in the southeast. The table counts, for each county, how many municipalities list a permit portal in our directory, and how many have no separate building department page at all, so permit questions go through the town office.
| County | Towns | Online portal | Share | Through the town office |
|---|---|---|---|---|
| Strafford | 13 | 5 | 38% | 3 |
| Rockingham | 37 | 9 | 24% | 2 |
| Belknap | 11 | 2 | 18% | 2 |
| Merrimack | 27 | 4 | 15% | 3 |
| Hillsborough | 31 | 4 | 13% | 6 |
| Sullivan | 15 | 2 | 13% | 6 |
| Carroll | 18 | 1 | 6% | 6 |
| Coos | 20 | 1 | 5% | 16 |
| Grafton | 39 | 2 | 5% | 24 |
| Cheshire | 23 | 1 | 4% | 7 |
| New Hampshire | 234 | 31 | 13% | 75 |
Two patterns stand out. Rockingham County has the most portal towns, including Salem and Portsmouth. Strafford County has the highest share: five of its 13 municipalities, among them Barrington, whose portal lets you apply for building, electrical and mechanical permits and search existing ones.
The North Country is the other end. In Coos County, 16 of 20 towns handle permit questions through the town office, and only Gorham lists a portal.
The counts are a snapshot. A town can switch systems at any time, so treat the table as a guide and check your own town's page before you apply.
Why does every New Hampshire town do this differently?
Because the state leaves the paperwork to the towns. RSA 155-A:3 lets each town set up its own local enforcement agency, and it reserves the issuing of permits, the collection of fees and other administrative functions for the municipality. The technical rules of the State Building Code are the same everywhere; how you hand in the application is not.
So a city with a full building department may buy permit software, while a small town with a part-time inspector may take forms at the counter during office hours. Some towns issue no building permits at all, which we cover in what happens when your town has no building inspector.
What does "online" actually mean in your town?
It can mean three different things, and New Hampshire's three largest cities happen to show all of them.
- A full portal. Concord now takes permit applications through its Citizen Self Service permit portal. Salem and Portsmouth also send applicants to an online permitting portal from their building pages.
- Email a PDF. Nashua asks applicants to fill in its PDF permit forms and email them to permits@nashuanh.gov. The form goes out as an email attachment, not through a portal.
- Download, print and mail. Manchester posts its permit applications online, but its electrical, heating and plumbing applications must be printed, signed and mailed to the Planning and Community Development Department, which says it does not accept them electronically. The approved permit is mailed back.
Some towns offer both. Gorham's building page offers online applications and also says the PDF building permit application is available at the Town Hall.
Which portal systems do New Hampshire towns use?
There is no single state system, so the 31 portal towns use about a dozen different vendors. OpenGov (formerly ViewPoint Cloud) is the most common in our directory, used by eight municipalities including Salem, Portsmouth, Keene and Lebanon. CloudPermit and PermitEyes each serve four towns, and iWorQ and Tyler's EnerGov three each. The rest use systems such as BS&A, Munis and SmartGov.
The practical point: what you learned in one town's portal is no guide to the next town's. Each town sets its own permit types, forms and steps, so start from the town's own building page, not from the vendor's website.
How do you find out how your town takes applications?
Start with your town's page in our New Hampshire building department directory. Each one lists the department's phone, hours and website, and a portal button where the town has one. Then follow these steps:
- Check whether your town issues building permits at all. If the town office only handles zoning, the rules are different.
- Find out what your project needs. A roof, a furnace or a window swap may each have its own rule; our guide to replacing a roof in New Hampshire is a good example of how the state rule and the town rule fit together.
- Agree with your contractor who files the application, and ask for the permit number before work starts.
- Keep the paper trail. If your town is email or paper only, keep a copy of what was sent and the approved permit, since you will not find it later in a portal.
A town without a portal is not a town without rules. The application just travels by email, mail or across the counter.
Frequently asked questions
Can you apply for a building permit online in New Hampshire?
Do you need a building permit in New Hampshire if your town has no online portal?
Which New Hampshire county has the most towns with online permits?
How do you apply for a building permit in Nashua or Manchester?
Planning a project?
Your town's page has the building office, how it takes permits, and a short form to get matched with licensed New Hampshire contractors.